BOURBON, MO ·
OSHA Inspection: N.B. WEST CONTRACTING CO.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of N.B. WEST CONTRACTING CO. in 3105 HWY FF, BOURBON, MO 65441 (NAICS 324122). OSHA activity number 342347671.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- N.B. WEST CONTRACTING CO.
- Site address
- 3105 HWY FF
- City
- BOURBON
- State
- MO
- ZIP
- 65441
- Mailing
- 2780 MARY AVENUE, SAINT LOUIS, MO 63144
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Union (A)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 324122
- Employees
- 2
- Ownership type
- Private (A)
Citations
8 citations on file for this inspection.
1910.147 C04 II
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $4,346 · Current $2,173 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to items of this section: Lockout, written, specific procedures were not developed and implemented for plant equipment, such as, but not limited to, the RAP conveyor electric motor, flywheel, belt and pulley. Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $2173
- · Z (S) $4346
1910.147 C06 I
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Where lockout work was conducted on equipment, such as, but not limited to, the RAP conveyor electric motor, flywheel, belt and pulley, an annual inspection had not been conducted and documented. Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.147 C06 II
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: Where lockout work was conducted on equipment, such as, but not limited to, the RAP conveyor electric motor, flywheel, belt and pulley, an annual inspection had not been conducted and documented. Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.147 C05 I
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $2,173 · Current $1,087 Reduced
General-duty citation text
29 CFR 1910.147(c)(5)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware were not provided by the employer for isolating, securing or blocking of machines or equipment from energy sources: Locks and lockout devices, such as, but not limited to, circuit breaker lockout devices, were not available for employees performing lockout work on equipment, such as, but not limited to, the RAP conveyor electric motor, flywheel, belt and pulley. Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $1086.5
- · Z (S) $2173
1910.147 D03
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $4,346 · Current $2,173 Reduced
General-duty citation text
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): An energy isolation device, such as the circuit breaker or main disconnect was not operated, for energy isolation (lockout), to the RAP bin conveyor motor/flywheel/belt and pulley, during maintenance and troubleshooting. Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $2173
- · Z (S) $4346
1910.219 B01
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $2,897 · Current $1,449 Reduced
General-duty citation text
29 CFR 1910.219(b)(1): Flywheel(s) with parts seven feet or less above floor(s) or platform(s) were not guarded in accordance with the requirements specified in 29 CFR 1910.219(b)(1)(i) through (b)(1)(iv): a. The guard to the RAP bin motor flywheel was not effective and did not meet the requirements of paragraph (b)(1). b. The guard to the shingle bin motor flywheel was not effective and did not meet the requirement of paragraph (b)(1). Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $1448.5
- · Z (S) $2897
1910.219 D01
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): a. The guard to the RAP bin conveyor motor belt and pulley was not effective and did not meet the requirements of paragraphs (m) and (o). b. The guard to the shingle bin conveyor motor belt and pulley was not effective and did not meet the requirement of paragraphs (m) and (o). Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1910.219 E03 I
- Issued
- Jun 14, 2017
- Abate by
- Aug 1, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.219(e)(3)(i): Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o): a. The guard to the RAP bin motor belt and pulley was not effective and did not meet the requirements of paragraphs (m) and (o). b. The guard to the shingle bin motor belt and pulley was not effective and did not meet the requirements of paragraphs (m) and (o). Abatement documentation is required for this violation.
Recent events (2)
- · I (S) $0
- · Z (S) $0
More inspections at N.B. West Contracting CO.
View N.B. West Contracting CO.'s full OSHA safety record →
More inspections in this industry (NAICS 324122)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 342347671.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.