NORFOLK, VA ·
OSHA Inspection: ADVANCED MARINE PRESERVATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ADVANCED MARINE PRESERVATION in 200 LIGON STREET, NORFOLK, VA 23523 (NAICS 336611). OSHA activity number 342386018.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ADVANCED MARINE PRESERVATION
- Site address
- 200 LIGON STREET
- City
- NORFOLK
- State
- VA
- ZIP
- 23523
- Mailing
- 1170 E OLNEY ROAD, NORFOLK, VA 23504
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 336611
- Employees
- 42
- Ownership type
- Private (A)
Citations
4 citations on file for this inspection.
1910.134 I05 III
- Issued
- Aug 23, 2017
- Abate by
- Sep 19, 2017
- Penalty
- Initial $4,889 · Current $2,445 Reduced
General-duty citation text
29 CFR 1910.134(i)(5)(iii): Sorbent beds and filters were not maintained and replaced or refurbished periodically following the manufacturers instructions: a) USS Gonzalez: On or about 06/08/2017, the Radex airline filter was not maintained and replaced in accordance with the manufacturer in that paint covered the outlet gauge and the replacement of the micro filter was past due. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $2444.5
- · Z (S) $4889
1910.134 I05 IV
- Issued
- Aug 23, 2017
- Abate by
- Sep 19, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(i)(5)(iv): The employer did not ensure that the person authorized to perform the necessary sorbent bed and filter changes filled out a tag indicating by the signature and date that maintenance changes were performed: a) USS Gonzalez: On or about 06/08/2017, the employer did not sign, dated and posted the most recent filter change at the compressor. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (O) $0
- · Z (S) $0
1915.132 D
- Issued
- Aug 23, 2017
- Abate by
- Sep 19, 2017
- Penalty
- Initial $4,889 · Current $2,445 Reduced
General-duty citation text
29 CFR 1915.132(d): Worn and or frayed electric cables were not taken out of service. a) USS Gonzalez: On or about 06/08/2017, the flexible cord attached to the 110-volt light used in blasting operations had a cut in the outer jacket that exposed the internal copper wires, as a result employee was exposed to an electrical shock hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (O) $2444.5
- · Z (S) $4889
1915.1026 D01
- Issued
- Aug 23, 2017
- Abate by
- Sep 19, 2017
- Penalty
- Initial $4,889 · Current $0 Reduced
General-duty citation text
29 CFR 1915.1026(d)(1): The employer with a workplace or work operation covered by this standard did not determine the 8-hour time-weighted average exposure for each employee exposed to chromium (VI): a) USS Gonzalez DD-66, Tank 5-126-2-F: On or about March 11, 2017, the employer did not perform an initial determination of employee exposure to Chromium (VI) where employee abrasive blasted paint that contented up to 2.65 percent chromium. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $4889
More inspections in this industry (NAICS 336611)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 342386018.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.