OSHA Inspection: GARZA HOME IMPROVEMENTS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GARZA HOME IMPROVEMENTS in 914 S. 11TH ST., MANITOWOC, WI 54220 (NAICS 236118). OSHA activity number 342397825.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Garza Home Improvements for free Get an email when a new federal OSHA severe-injury report for Garza Home Improvements is published. One employer, no account, unsubscribe in one click.
Site address
914 S. 11TH ST.
City
MANITOWOC
State
WI
ZIP
54220
Mailing
806A BUFFALO ST., MANITOWOC, WI 54220
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
4
Ownership type
Private (A)

9 citations on file for this inspection.

1903.19 C01

Other-than-serious 7 instances 3 exposed
Issued
Oct 17, 2018
Abate by
Nov 15, 2018
Penalty
Initial $1,037 · Current $1,037
29 CFR 1903.19(c)(1):   The employer failed to certify to OSHA (the Agency) that the following item(s) were abated within 10 calendar days after the abatement date:  a) Garza Home Improvements, did not provide abatement certification within 10 calendar days after the abatement date on all the cited items.
Recent events (1)
  • · Z (O) $1037

1903.19 D01

Other-than-serious 2 instances 3 exposed
Issued
Oct 17, 2018
Abate by
Nov 15, 2018
Penalty
Initial $0 · Current $0
29 CFR 1903.19(d)(1): The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.   Garza Home Improvements, failed to provide documentation demonstrating the abatement method and completion of the cited items.
Recent events (1)
  • · Z (O) $0

1926.451 B01

Serious Gravity 5 2 instances 2 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; scaffolds erected three sections high was not fully planked with construction grade material on the working level exposing employees to fall hazards.
Recent events (3)
  • · R (S) $2716
  • · C (S) $2716
  • · Z (S) $2716

1926.451 F03

Serious Gravity 10 2 instances 2 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $3,803 · Current $3,803
29 CFR 1926.451(f)(3): Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; the employer did not have a competent person, capable of identifying existing and predictable hazards, inspect the scaffold before each work shift while employees worked on two scaffold units to correct defects such as but not limited to:  missing diagonal braces, location to live electrical wires, missing fall protection, and not being fully planked on the working surface.
Recent events (3)
  • · R (S) $3803
  • · C (S) $3803
  • · Z (S) $3803

1926.451 F06

Serious Gravity 10 1 instance 2 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(6): The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows:                       *Insulated Lines  _____________________________________________________________________                                                                      Voltage                Minimum distance           Alternatives ____________________ ________________________ _______________________                                                               Less than 300 volts.   3 feet (0.9 m)           300 volts to 50 kv.    10 feet (3.1 m)          More than 50 kv.....  10 feet (3.1 m) plus     2 times the length                               0.4 inches (1.0 cm)      of the line                               for each 1 kv over       insulator, but never                               50 kv.                        less than 10                                                               feet (3.1 m). ____________________ ________________________ _______________________                         *Uninsulated lines _____________________________________________________________________                                                                          Voltage                       Minimum distance         Alternatives ____________________ __________________ ______________________________                                                                      Less than 50 kv.....          10 feet (3.1 m).          More than 50 kv.....         10 feet (3.1 m) plus     2 times the length of                                       0.4 inches (1.0 cm)     the line insulator,                                       for each 1 kv over       but never less than                                       50 kv.                        10 feet (3.1 m). ____________________ __________________ ______________________________  Exception to paragraph (f)(6): Scaffolds and materials may be closer to power lines than specified above where such clearance is necessary for performance of work, and only after the utility company, or electrical system operator, has been notified of the need to work closer and the utility company, or electrical system operator, has deenergized the lines, relocated the lines, or installed protective coverings to prevent accidental contact with the lines.  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; a scaffold three sections high was erected next to insulate electrical wires leading into the residential house.
Recent events (3)
  • · R (S) $0
  • · C (S) $0
  • · Z (S) $0

1926.451 G01

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet (3.1 m) above a lower level shall be protected from falling to that lower level. Paragraphs (g)(1)(i) through (vii) of this section establish the types of fall protection to be provided to the employees on each type of scaffold.  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; unidentified mobile scaffold (cream and orange colored) erected three sections high did not have a means of fall protection installed exposing employees to fall hazards.  (b)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; unidentified mobile scaffold (blue colored) erected three sections high did not have a means of fall protection installed exposing employees to fall hazards.
Recent events (3)
  • · R (S) $2716
  • · C (S) $2716
  • · Z (S) $2716

1926.452 W01

Serious Gravity 5 2 instances 2 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1926.452(w)(1): Scaffolds shall be braced by cross, horizontal, or diagonal braces, or combination thereof, to prevent racking or collapse of the scaffold and to secure vertical members together laterally so as to automatically square and align the vertical members. Scaffolds shall be plumb, level, and squared. All brace connections shall be secured.  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; unidentified mobile scaffold (cream and orange colored) erected three sections high did not have a diagonal bracing to maintain square and plumb.  (b)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; unidentified mobile scaffold (blue colored) erected three sections high did not have a diagonal bracing to maintain square and plumb.
Recent events (3)
  • · R (S) $2716
  • · C (S) $2716
  • · Z (S) $2716

1926.501 B13

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1926.501(b)(13): "Residential construction." Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan which meets the requirements of paragraph (k) of 1926.502.  Note: There is a presumption that it is feasible and will not create a greater hazard to implement at least one of the above-listed fall protection systems. Accordingly, the employer has the burden of establishing that it is appropriate to implement a fall protection plan which complies with 1926.502(k) for a particular workplace situation, in lieu of implementing any of those systems.  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; fall protection was not utilized while performing roofing activities from a residential roof exposing employees to fall hazards.  (b)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; fall protection was not utilized while performing roofing activities from a residential garage roof exposing employees to fall hazards.
Recent events (3)
  • · R (S) $2716
  • · C (S) $2716
  • · Z (S) $2716

1926.1053 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 19, 2017
Abate by
Aug 16, 2017
Penalty
Initial $2,716 · Current $2,716
29 CFR 1926.1053(b)(1): When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.  (a)  On or about June 14, 2017, at the 914 South 11th Street, Manitowoc jobsite; the Keller extension ladder extended one rung above the scaffold platform exposing  employees to slip hazards.
Recent events (3)
  • · R (S) $2716
  • · C (S) $2716
  • · Z (S) $2716

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 342397825.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.