RICHMOND, VA —
OSHA Inspection: ATHENS BUILDING CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ATHENS BUILDING CORPORATION in 8000 JEFFERSON DAVIS HWY BUILDING 34 DLA, RICHMOND, VA 23297 (NAICS 238390). OSHA activity number 342512308.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ATHENS BUILDING CORPORATION
- Site address
- 8000 JEFFERSON DAVIS HWY BUILDING 34 DLA
- City
- RICHMOND
- State
- VA
- ZIP
- 23297
- Mailing
- 1700 BROAD ROCK BLVD, RICHMOND, VA 23224
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238390
- Employees
- 25
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.404 B01 II
- Issued
- Sep 29, 2017
- Abate by
- Oct 12, 2017
- Penalty
- Initial $3,694 · Current $2,586 Reduced
General-duty citation text
29 CFR 1926.404(b)(1)(ii): Where an assured equipment grounding program was not utilized, receptacles were not protected with ground-fault circuit-interrupters when on a two-wire, single-phase portable or vehicle-mounted generator rated more than 5kW, or where the circuit conductors of the generator were not insulated from the generator fame and all other grounded surfaces: a) Defense Logistics Agency, Building 34: On or about 07/27/2017, the Predator 6,500 peak watts generator used by employees to supply power to a chop saw, battery charger and table saw was not provided with ground fault interrupter protection, thereby exposed employees to a possible electrical shock hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2585.8
- — Z (S) $3694
1926.404 F06
- Issued
- Sep 29, 2017
- Abate by
- Oct 12, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) Defense Logistics Agency, Building 34: On or about 07/27/2017, the UTILITECH 5-outlet adapter used by employees to supply power to a chop saw, battery charger, and table saw the path to ground was not continuous and permanent in that the ground prong was missing from the male attachment plug thereby exposed employees to a possible electrical shock hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.502 B02
- Issued
- Sep 29, 2017
- Abate by
- Oct 12, 2017
- Penalty
- Initial $3,079 · Current $2,155 Reduced
General-duty citation text
29 CFR 1926.502(b)(2): Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members were not installed between the top edge of the guardrail system and the walking/working surface when there was no wall or parapet wall at least 21 inches (53 cm) high: a) Defense Logistics Agency, Building 34: On or about 07/27/2017, a middle rail was not installed on the prefabricated 5'x 5' frame scaffolding system erected approximately 37 feet high along the building exterior, as a result employees were exposed to a possible fall hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2155.3
- — Z (S) $3079
1926.501 B01
- Issued
- Sep 29, 2017
- Abate by
- Oct 12, 2017
- Penalty
- Initial $3,079 · Current $2,155 Reduced
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. a) Defense Logistics Agency, Building 34: On or about 07/27/2017, an employee was on the roof without fall protection loading wood into a basket attached to the forks of a rough terrain forklift truck as a result employee was exposed to a 27 feet fall hazard. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2155.3
- — Z (S) $3079
More inspections at Athens Building Corporation
View Athens Building Corporation's full OSHA safety record →
More inspections in this industry (NAICS 238390)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342512308.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.