GANADO, AZ —
OSHA Inspection: BEATY MASONRY COMPANY, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BEATY MASONRY COMPANY, LLC in GANADO SHOPPING CENTER-JOB #1636 JUNCTION 264 & 191 NORTH, GANADO, AZ 86505 (NAICS 238140). OSHA activity number 342538139.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BEATY MASONRY COMPANY, LLC
- Site address
- GANADO SHOPPING CENTER-JOB #1636 JUNCTION 264 & 191 NORTH
- City
- GANADO
- State
- AZ
- ZIP
- 86505
- Mailing
- 6219 CORONA AVE. NE, ALBUQUERQUE, NM 87113
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.134 E01
- Issued
- Aug 25, 2017
- Abate by
- Sep 21, 2017
- Penalty
- Initial $4,889 · Current $0 Reduced
General-duty citation text
29 CFR 1910.134(e)(1): The employer did not provide a medical evaluation to determine the employee's ability to use a respirator, before the employee was fit tested or required to use the respirator in the workplace (Construction Reference 1926.103): Ganado Shopping Center construction site-Job #1636: The forklift operator was not provided a medical evaluation before he was required to wear a NIOSH respirator when adding Portland cement, lime and sand to the mortar mixer.
Recent events (2)
- — I (S) $0
- — Z (S) $4889
1910.134 F02
- Issued
- Aug 25, 2017
- Abate by
- Sep 21, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(f)(2): Employee(s) using tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator (Construction Reference 1926.103): Ganado Shopping Center construction site-Job #1636: The forklift operator was not fit tested before he was required to wear a NIOSH respirator when adding Portland cement, lime and sand to the mortar mixer.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.134 G01 I A
- Issued
- Aug 25, 2017
- Abate by
- Sep 21, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(g)(1)(i)(A): Respirators with tight-fitting facepieces were worn by employees who had facial hair that came between the sealing surface of the facepiece and the face or that interfered with valve function: (Construction Reference 1926.103) Ganado Shopping Center construction site-Job #1636: The forklift operator had facial hair that interfered with the seal of the NIOSH respirator he wore when adding Portland cement, lime and sand to the mortar mixer.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.134 K
- Issued
- Aug 25, 2017
- Abate by
- Sep 21, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(k): The employer did not provide comprehensive, understandable, and effective annual training to employees who were required to use respirators (Construction Reference 1926.103): Ganado Shopping Center construction site-Job #1636: Annual respirator training was not provided to the forklift operator who was required to wear a NIOSH respirator when adding Portland cement, lime and sand to the mortar mixer.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01 I
- Issued
- Aug 25, 2017
- Abate by
- Sep 14, 2017
- Penalty
- Initial $4,155 · Current $4,000 Reduced
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary: Ganado Shopping Center construction site-Job #1636: Employees worked from a 4-tower "Non-Stop" adjustable scaffold, approximately 20 feet above ground level, that was not fully planked and the spacing between planks was greater than 1 inch.
Recent events (2)
- — I (S) $4000
- — Z (S) $4155
1926.451 C03
- Issued
- Aug 25, 2017
- Abate by
- Sep 14, 2017
- Penalty
- Initial $6,926 · Current $4,000 Reduced
General-duty citation text
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, posts, frames, and uprights were not plumb and braced to prevent swaying and displacement: Ganado Shopping Center-Job #1636: Employees worked from a 4-tower "Non-Stop" adjustable scaffold, approximately 20 feet above ground level, that was not braced at the bottom of the open bay.
Recent events (2)
- — I (O) $4000
- — Z (S) $6926
1926.451 G04 I
- Issued
- Aug 25, 2017
- Abate by
- Sep 21, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms: a) Ganado Shopping Center construction site-Job #1636: Employees worked from a 4-tower "Non-Stop" adjustable scaffold, approximately 20 feet above ground level, that did not have a midrail on the walking/work platform. b) Ganado Shopping Center construction site-Job #1636: Employees worked from a 4-tower "Non-Stop" adjustable scaffold, approximately 20 feet above ground level, that did not have a midrail on the material platform.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.134 C01
- Issued
- Aug 25, 2017
- Abate by
- Sep 21, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use (Construction Reference 1926.103): Ganado Shopping Center construction site-Job #1636: The written respiratory program was not worksite-specific to include the use of respiratory protection when adding Portland cement, lime and sand to the mortar mixer. The company's Activity Hazard Analysis identified an inhalation hazard of Portland cement, lime dust and/or silica when adding Portland cement, lime or sand to the mortar mixer.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Beaty Masonry Company, LLC
View Beaty Masonry Company, LLC's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in AZ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342538139.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.