OSHA Inspection: GENERAL MILLS, INC.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of GENERAL MILLS, INC. in 2403 S. PENNSYLVANIA AVE., WELLSTON, OH 45692 (NAICS 311412). OSHA activity number 342584505.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch General Mills, INC. for free Get an email when a new federal OSHA severe-injury report for General Mills, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
GENERAL MILLS, INC.
Site address
2403 S. PENNSYLVANIA AVE.
City
WELLSTON
State
OH
ZIP
45692
Mailing
2403 S. PENNSYLVANIA AVE., WELLSTON, OH 45692
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Union (A)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
311412
Employees
1300
Ownership type
Private (A)

3 citations on file for this inspection.

1910.119 D03 I B

Other-than-serious 3 instances 1300 exposed
Issued
Sep 28, 2017
Abate by
Nov 2, 2017
Penalty
Initial $12,675 · Current $8,450 Reduced
29 CFR 1910.119(d)(3)(i)(B): Piping and instrument diagrams (P&ID's);    29 CFR 1910.119(d)(3)(i): Information pertaining to the equipment in the process shall include:      a.  On or about August 21, 2017, the process safety information, pertaining to the equipment of the ammonia refrigeration system, did not include all of the piping and instrument diagrams equipment including, but not limited, to the Line 1 Crust Cooler Setra Pressure Transducer.      b.  On or about August 21, 2017, the process safety information pertaining to the equipment of the ammonia refrigeration system did not include all of the piping and instrument diagrams equipment including, but not limited, to the Line 2 Crust Cooler Setra Pressure Transducer.
Recent events (3)
  • · F (O) $8450
  • · C (S) $12675
  • · Z (S) $12675

1910.119 J04 III

Other-than-serious 3 instances 1300 exposed
Issued
Sep 28, 2017
Abate by
Jan 31, 2019
Penalty
Initial $12,675 · Current $12,675
29 CFR 1910.119(j)(4)(iii):  The frequency of inspections and tests of process equipment shall be consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience:     a.  On or about August 21, 2017, in the ammonia refrigeration system, the inspection and testing of the Line 1 Crust Cooler Setra Pressure Transducer was not performed annually as consistent with RAGAGEP and the frequency established by the employer's Mechanical Integrity Program.      b.  On or about August 21, 2017, in the ammonia refrigeration system, the inspection and testing of the Line 2 Crust Cooler Setra Pressure Transducer was not performed annually as consistent with RAGAGEP and the frequency established by the employer's Mechanical Integrity Program.      c.  On or about August 21, 2017, in the ammonia refrigeration system, the inspection and testing of the Line 4 Crust Cooler Setra Pressure Transducer was not performed annually as consistent with RAGAGEP and the frequency established by the employer's Mechanical Integrity Program.
Recent events (3)
  • · F (O) $12675
  • · C (S) $12675
  • · Z (S) $12675

1910.119 L01

Other-than-serious 3 instances 1300 exposed
Issued
Sep 28, 2017
Abate by
Jan 31, 2019
Penalty
Initial $12,675 · Current $12,675
29 CFR 1910.119(l)(1): The employer shall establish and implement written procedures to manage changes (except for "replacements in kind") to process chemicals, technology, equipment, and procedures; and, changes to facilities that affect a covered process.    a.  On or about August 21, 2017, a management of change pertaining to process equipment was not written when the Line 1 Crust Cooler Setra Pressure Transducer was removed from the system and replaced with a plug.     b  On or about August 21, 2017, a management of change pertaining to process equipment was not written when the Line 2 Crust Cooler Setra Pressure Transducer was removed from the system and replaced with a plug.    c.  On or about August 21, 2017, a management of change pertaining to process equipment was not written when the Line 4 Crust Cooler Setra Pressure Transducer was removed from the system and replaced with a plug.
Recent events (3)
  • · F (O) $12675
  • · C (S) $12675
  • · Z (S) $12675

View General Mills, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 342584505.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.