Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: INDUSTRIAL FUMIGANT COMPANY, LLC.

Federal Agency inspection · Health discipline

On , OSHA opened a federal Agency health inspection of INDUSTRIAL FUMIGANT COMPANY, LLC. in 6663 W. 99TH STREET, CHICAGO RIDGE, IL 60415 (NAICS 561710). OSHA activity number 342724846.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Industrial Fumigant Company, LLC. — free Get an email when a new federal OSHA severe-injury report for Industrial Fumigant Company, LLC. is published. One employer, no account, unsubscribe in one click.
Site address
6663 W. 99TH STREET
City
CHICAGO RIDGE
State
IL
ZIP
60415
Mailing
13420 WEST 99TH STREET, LENEXA, KS 66215
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
561710
Employees
5
Ownership type
A

2 citations on file for this inspection.

1910.1000 A01

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 2, 2018
Abate by
Mar 8, 2018
Penalty
Initial $12,934 · Current $10,000 Reduced

Hazardous substances 1680

29 CFR 1910.1000(a)(1): Employee(s) were exposed to an airborne concentration of methyl bromide listed in Table Z-1 in excess of the ceiling concentration of 20 ppm:     a. On or about October 23, 2017, at the IFC business site located at 6663 W. 99th Street, Chicago Ridge, IL 60415, an employee was exposed to methyl bromide in excess of the ceiling concentration of 20 ppm.  This limit is established to prevent employees from suffering from adverse health effects such as dizziness, slurred speech, convulsions and death.
Recent events (2)
  • — I (S) $10000
  • — Z (S) $12934

1910.1000 E

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 2, 2018
Abate by
Jul 13, 2018
Penalty
Initial $0 · Current $0

Hazardous substances 1680

29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d):   a. On or about October 23, 2017, at the IFC business site located at 6663 W. 99th Street, Chicago Ridge, IL 60415, an employee was exposed to methyl bromide in excess of the ceiling concentration of 20 ppm.  This limit is established to prevent employees from suffering from adverse health effects such as dizziness, slurred speech, convulsions and death.  Engineering and work practice controls (including administrative controls) were not implemented to reduce and maintain employee exposure to methyl bromide in accordance with the schedule in Table 1 of this paragraph:   In the company's chemical storage area, general methods of control applicable in these circumstances include, but are not limited to the following:   1. Eliminate the exposure for employees by removing the need to transfer the methyl bromide to a smaller cylinder.   2. Store the methyl bromide cylinders in a separate building that include engineering controls such as  local ventilation.   3. Install a continuous monitoring system with a warning system.   Abatement:   Step 1:  Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposure to the hazardous substances referred in this citation.  The plan shall include, at minimum, target dates for the following actions which must be consistent with abatement dates required by this citation.   (1) Evaluation of engineering/administrative control options;   (2) Selection of optimum control methods and completion of design;   (3) Procurement, installation and operation of selected control measures; and  (4) Testing and acceptance or modification/redesign of controls.   Note: All proposed measures shall be approved for each particular use by a competent industrial hygienist or other qualified person. Ninety (90) day progress reports are required during the abatement period.   Date by Which Abatement is Due (60 days):                        Step 2: Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance.    Date by Which Abatement is Due (90 days):
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342724846.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.