Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PURCELL CONSTRUCTION CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PURCELL CONSTRUCTION CORPORATION in FORT LEE ARMY BASE, FORT LEE, VA 23801 (NAICS 236220). OSHA activity number 342728672.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Purcell Construction Corporation — free Get an email when a new federal OSHA severe-injury report for Purcell Construction Corporation is published. One employer, no account, unsubscribe in one click.
Site address
FORT LEE ARMY BASE
City
FORT LEE
State
VA
ZIP
23801
Mailing
7730 WHITEPINE ROAD, RICHMOND, VA 23237
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
140
Ownership type
A

3 citations on file for this inspection.

1926.34 C

Deleted Serious Gravity 1 1 instance 1 exposed
Issued
Dec 7, 2017
Abate by
Jan 4, 2018
Penalty
Initial $4,155 · Current $0 Reduced
29 CFR 1926.34(c): Means of egress was not continually maintained free of all obstructions or impediments to full instant use in the case of fire or other emergency.    a)    Barrack section 5A5 top floor: On or about 10/25/2017, the means of egress to stairway was not continually maintained free of impediments in that a scaffold pole was erected directly in front of the stairway that caused a potential trip hazard.     Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4155

1926.405 G02 V

Other-than-serious 1 instance 1 exposed
Issued
Dec 7, 2017
Penalty
Initial $3,532 · Current $1,766 Reduced
29 CFR 1926.405(g)(2)(v): Flexible cords and cables were not protected by bushings or fittings where passing through holes in covers, outlet boxes, or similar enclosures:      a)    Building section 5A5: On or about 10/25/2017, a yellow extension cord used to supply power to a battery charger through a hole in a gang-box was not protected from abrasion.     No abatement certification or documentation required.
Recent events (2)
  • — I (O) $1766
  • — Z (S) $3532

1926.501 B04 II

Deleted Other-than-serious 1 instance 4 exposed
Issued
Dec 7, 2017
Abate by
Jan 4, 2018
Penalty
Initial $4,155 · Current $0 Reduced
29 CFR 1926.501(b)(4)(ii): Each employee on a walking/working surface was not protected from tripping in or stepping into or through holes (including skylights) by covers:    a) Building section 5A5: On or about 10/25/2017, covers were not provided over the 4 inch holes in the floor which an employee could trip or step.    Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (S) $4155

View Purcell Construction Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342728672.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.