HOUSTON, TX —
OSHA Inspection: PETROMAX REFINING COMPANY, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PETROMAX REFINING COMPANY, LLC in 1519 S. SHELDON ROAD, HOUSTON, TX 77015 (NAICS 211112). OSHA activity number 342801693.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PETROMAX REFINING COMPANY, LLC
- Site address
- 1519 S. SHELDON ROAD
- City
- HOUSTON
- State
- TX
- ZIP
- 77015
- Mailing
- 1519 S. SHELDON ROAD, HOUSTON, TX 77015
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 211112
- Employees
- 40
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.119 E03 V
- Issued
- May 29, 2018
- Abate by
- Jun 15, 2018
- Penalty
- Initial $9,054 · Current $6,338 Reduced
General-duty citation text
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address the hazards related to facility siting: The violation occurred in the PetroMax Refining facility on or about November 29, 2017, when the employer did not ensure that the facility siting study and or blast study adequately addressed occupancy time and duration at the maintenance shop, exposing employees to fire and explosion hazards.
Recent events (2)
- — I (S) $6338
- — Z (S) $9054
1910.119 H02 I
- Issued
- May 29, 2018
- Abate by
- Jun 15, 2018
- Penalty
- Initial $3,880 · Current $1,940 Reduced
General-duty citation text
29 CFR 1910.119(h)(2)(i): The employer, when selecting a contractor , did not obtain and evaluate information regarding the contract employer's safety performance and program: On or about November 29, 2017, when the employer did not evaluate the safety performance and programs of contractors Basic Equipment, prior to allowing them to perform work on a covered process.
Recent events (2)
- — I (O) $1940
- — Z (S) $3880
1910.119 J02
- Issued
- May 29, 2018
- Abate by
- Aug 15, 2018
- Penalty
- Initial $9,054 · Current $6,338 Reduced
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. On or about 11/29/2017, at Petromax Refinery facility in Houston Texas, the employer did not ensure that written procedures for testing or inspecting of process equipment were established and implemented for equipment including, but not limited to: a) Block valves associated with pressure relief devices b) Interlock I-001: Total Crude Unit Emergency Shutdown c) Flare stack system F-102
Recent events (2)
- — I (S) $6338
- — Z (S) $9054
1910.119 J04 I
- Issued
- May 29, 2018
- Abate by
- Aug 15, 2018
- Penalty
- Initial $9,054 · Current $6,338 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(i): The employer did not perform inspections and tests on process equipment: On or about 11/29/2017, at Petromax Refining facility in Houston Taxes, the employer did not perform inspections and testing on process equipment for systems such as, but not limited to, the following: a) The flare pilot, ignition system and a blower of the flare stack. b) Interlock I-033(P&ID 2366-P-D005 Rev.7) c) Interlock I-002 (P&ID 2366-P-D005 Rev.7) d) Interlock I-037 (P&ID 2366-P-D0040 Rev.3) e) Level indicator for the de-salter LIC-100-D-102 (P&ID 2366-P-D008 Rev.6) f) High high level alarm for LPG storage tank LAHH -108-D-002 (P&ID 2366-P-D0040 Rev.3) g) Interlock I-045 (P&ID 2366-P-D0047 Rev.5) h) Emergency Block Valve (EBV) for instrument air EBV-111-D-004 (P&ID 2366-P-D0047 Rev.5)
Recent events (2)
- — I (S) $6338
- — Z (S) $9054
1910.119 J04 II
- Issued
- May 29, 2018
- Abate by
- Jul 16, 2018
- Penalty
- Initial $6,467 · Current $4,527 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(ii): Inspection and testing procedures did not follow recognized and generally accepted good engineering practices (RAGAGEP): On or about 11/29/2017, at Petromax Refinery facility in Houston Texas, the employer did not establish corrosion rates in accordance with recognized and generally accepted good engineering practices such as America Petroleum Institute (API) Standard 510 - 2014 (Pressure Vessel Code: In-service Inspection, Rating, Repair, and Alteration), Section 7.1.2 for vessels including, but not limited to the following: a) D100: De-salter (P&ID 2366-P-D0008 Rev.6) b) T101: Crude Column (P&ID 2366-P-D0012/13 Rev.5) c) D105: LPG (Liquid Petroleum Gas) Accumulator (P&ID 2366-P-D0028 Rev.7) d) D108: LPG Storage tank (P&ID 2366-P-D0040 Rev.3)
Recent events (2)
- — I (S) $4527
- — Z (S) $6467
1910.147 C04 II B
- Issued
- May 29, 2018
- Abate by
- Jun 15, 2018
- Penalty
- Initial $9,054 · Current $6,338 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: On or about November 29, 2017, at PetroMax Refining, the employer's energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy, for equipment including but not limited to: a) Diesel Distillate product pump P-105-2 b) Control valve TAN system
Recent events (2)
- — I (S) $6338
- — Z (S) $9054
1910.305 G01 IV A
- Issued
- May 29, 2018
- Abate by
- Jun 15, 2018
- Penalty
- Initial $5,174 · Current $3,621 Reduced
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: On or about November 29, 2017, throughout the facility where employees were exposed to electrical and trip hazards due to flexible cords that were used to provided power to multiple permanently fixed machines without permanent hard wired fixtures.
Recent events (2)
- — I (S) $3621
- — Z (S) $5174
More inspections at Petromax Refining Company, LLC
View Petromax Refining Company, LLC's full OSHA safety record →
More inspections in this industry (NAICS 211112)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342801693.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.