OSHA Inspection: VALENCIA CONCRETE CONSTRUCTION

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of VALENCIA CONCRETE CONSTRUCTION in 2761 GONSALVES AVENUE MCAS MIRAMAR, SAN DIEGO, CA 92145 (NAICS 238140). OSHA activity number 342880911.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Valencia Concrete Construction — free Get an email when a new federal OSHA severe-injury report for Valencia Concrete Construction is published. One employer, no account, unsubscribe in one click.
Site address
2761 GONSALVES AVENUE MCAS MIRAMAR
City
SAN DIEGO
State
CA
ZIP
92145
Mailing
28734 BRODIAEA AVENUE, MORENO VALLEY, CA 92555
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
2
Ownership type
A

5 citations on file for this inspection.

1910.1200 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 9, 2018
Abate by
Feb 20, 2018
Penalty
Initial $1,663 · Current $848 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:     MCAS Miramar Starbucks Project trash corral: A written hazard communication program was not developed and implemented at the jobsite where employees were working with Portland Cement-based mortar products. Employees were exposed to chemical burn hazards.
Recent events (2)
  • — I (S) $848.13
  • — Z (S) $1663

1910.1200 G08

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 9, 2018
Abate by
Feb 20, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(8):   The employer did not maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and did not ensure that they were readily accessible during each work  shift to employees when they were in their work area(s):  MCAS Miramar Starbucks Project trash corral: Safety Data Sheets for the Pre-Blended Dry Mortar were not maintained at the jobsite. Employees were exposed to chemical burn hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H01

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 9, 2018
Abate by
Feb 20, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:   MCAS Miramar Starbucks Project trash corral: Training on the hazard communication program, including chemical hazards and maintenance of safety data sheets, was not provided to employees using Portland Cement-based mortar  products. Employees were exposed to chemical burn hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.95 A

Serious Gravity 1 2 instances 2 exposed
Issued
Feb 9, 2018
Abate by
Feb 20, 2018
Penalty
Initial $1,663 · Current $848 Reduced
29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact.    MCAS Miramar Starbucks Project trash corral:   a) Employee(s) were working with Portland Cement-based mortar mix without the use of eye protection. Employees were exposed to chemical burn hazards.  b) Employee(s) were working with Portland Cement-based mortar mix without the use of impervious gloves. Employees were exposed to chemical burn hazards.
Recent events (2)
  • — I (S) $848.13
  • — Z (S) $1663

1926.701 B

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Feb 9, 2018
Penalty
Initial $2,772 · Current $0 Reduced
29 CFR 1926.701(b): All protruding reinforcing steel, onto and/or into which employees could fall or come against, was not guarded to eliminate the hazard of impalement:  MCAS Miramar Starbucks Project trash corral: Rebar protruding 19 inches from the top of the block wall was not protected. Employees were exposed to impalement hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2772

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342880911.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.