OSHA Inspection: VAN'S REMODELING & ROOFING

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of VAN'S REMODELING & ROOFING in 100 EMANCIPATION DR., BLDG 48 HAMPTON VAMC, HAMPTON, VA 23667 (NAICS 238160). OSHA activity number 342927290.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Van'S Remodeling & Roofing — free Get an email when a new federal OSHA severe-injury report for Van'S Remodeling & Roofing is published. One employer, no account, unsubscribe in one click.
Site address
100 EMANCIPATION DR., BLDG 48 HAMPTON VAMC
City
HAMPTON
State
VA
ZIP
23667
Mailing
1637 HIGH PLAINS DR., VIRGINIA BEACH, VA 23464
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
9
Ownership type
A

3 citations on file for this inspection.

1926.451 G01 I

Serious Gravity 5 1 instance 3 exposed
Issued
Mar 2, 2018
Abate by
Mar 28, 2018
Penalty
Initial $2,772 · Current $1,500 Reduced
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system:  a) 100 Emancipation Dr., Building 48, Hampton, VA 23667: On or about February 1, 2018, each employee that performed work from a ladder jack scaffold approximately 15' above the ground was not protected by a personal fall arrest system, exposing employees to fall hazards.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2772

1926.454 A01

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Mar 2, 2018
Abate by
Mar 28, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a)(1): The employer failed to have each employee who performs work while on a scaffold trained regarding the nature of any electrical hazards, fall hazards and falling object hazards in the work area:  a) 100 Emancipation Dr., Building 48, Hampton, VA 23667: On or about February 1, 2018, and times prior thereto, each subcontractor employee that performed work while on a ladder jack scaffold was not trained in fall hazards and the procedures to be followed to minimize such hazards.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 E01

Serious Gravity 5 2 instances 2 exposed
Issued
Mar 2, 2018
Abate by
Mar 28, 2018
Penalty
Initial $2,772 · Current $1,500 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used:  a) 100 Emancipation Dr., Building 48, Hampton, VA 23667: On or about February 1, 2018, each employee that accessed a ladder jack scaffold platform approximately 15' above the ground was not provided a safe means of access. Employees accessed the scaffold platform by climbing over said platform from the support ladders.  Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $2772

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342927290.