CLEVELAND, OH —
OSHA Inspection: CLECORR INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CLECORR INC. in 10610 BEREA ROAD, CLEVELAND, OH 44102 (NAICS 322211). OSHA activity number 342936754.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CLECORR INC.
- Site address
- 10610 BEREA ROAD
- City
- CLEVELAND
- State
- OH
- ZIP
- 44102
- Mailing
- 10610 BEREA ROAD, CLEVELAND, OH 44102
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 322211
- Employees
- 30
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 I
- Issued
- Mar 21, 2018
- Abate by
- May 7, 2018
- Penalty
- Initial $6,467 · Current $3,880 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. On or about February 8, 2018, the employer did not ensure energy control procedures were utilized when machine operators performed service and maintenance (set up) operations on the 35 Hooper Printer Slotter Machine and the S&S Partition Slotter Machine. Energy sources include, but not limited to, electric power.
Recent events (2)
- — I (S) $3880
- — Z (S) $6467
1910.147 D
- Issued
- Mar 21, 2018
- Abate by
- May 7, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: On or about February 8, 2018, the employer did not ensure machine operators performing service and maintenance (set up) operations on the 35 Hooper Printer Slotter Machine and the S&S Partition Slotter Machine implemented energy control procedures by; isolating the machine from the energy source(s) [per 1910.147(d)(3) requirements], affixing a lockout device(s) [(d)(4)(i)], and verifying de-energization and isolation had been accomplished prior to setting up the machines [(d)(6)]. Energy sources include, but not limited to, electric power.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Mar 21, 2018
- Abate by
- May 7, 2018
- Penalty
- Initial $6,467 · Current $3,880 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about February 8, 2018, the employer did not conduct periodic inspections of the energy control procedures to ensure machine operators performing service and maintenance (set up) operations on the 35 Hooper Printer Slotter Machine and the S&S Partition Slotter Machine were following the procedures and the requirements of the standard for energy isolation and control. Energy sources include, but not limited to, electric power.
Recent events (2)
- — I (S) $3880
- — Z (S) $6467
1910.212 A01
- Issued
- Mar 21, 2018
- Abate by
- May 7, 2018
- Penalty
- Initial $6,467 · Current $3,880 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): Types of guarding. One or more methods of machine guarding shall be provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks. a. On or about February 8, 2018, the employer did not ensure one or more methods of machine guarding was adequately provided to protect machine operators from hazards created by ingoing nip points and/or rotating parts of the feeder portion of the 35 Hooper Printer Slotter Machine. b. On or about February 8, 2018, the employer did not ensure one or more methods of machine guarding was adequately provided to protect machine operators from the hazards created by the point of operation of the rotating slotter discs of the S&S Partition Slotter Machine. c. On or about February 8, 2018, the employer did not ensure one or more methods of machine guarding was provided to protect packer employees from the ingoing nip points created by the S&S Partition Slotter Machine conveyor belts as they cycle around the end pulley. d. On or about February 8, 2018, the employer did not ensure one or more methods of machine guarding was provided to protect machine operators from the point of operation ingoing nip point created the feed roller(s) of the of the Universal Gluer Machine.
Recent events (2)
- — I (S) $3880
- — Z (S) $6467
More inspections in this industry (NAICS 322211)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342936754.