PROSPECT HEIGHTS, IL —
OSHA Inspection: ORTEGA HOMES, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ORTEGA HOMES, INC. in 1225 DRURY LANE, PROSPECT HEIGHTS, IL 60070 (NAICS 238130). OSHA activity number 342947413.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ORTEGA HOMES, INC.
- Site address
- 1225 DRURY LANE
- City
- PROSPECT HEIGHTS
- State
- IL
- ZIP
- 60070
- Mailing
- 1438 WORDEN WAY, ELK GROVE VILLAGE, IL 60007
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 4
- Ownership type
- A
Citations
8 citations on file for this inspection.
1903.19 C01
- Issued
- Jul 25, 2018
- Abate by
- Jul 31, 2018
- Penalty
- Initial $311 · Current $0 Reduced
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Ortega Homes, Inc. failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 02 01 04/10/2018 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (O) $0
- — Z (O) $311
1926.102 A01
- Issued
- Mar 15, 2018
- Abate by
- Mar 21, 2018
- Penalty
- Initial $2,439 · Current $1,540 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection when machines or operations present potential eye or face injury from physical, chemical, or radiation agents: a) On or about February 14, 2018, employees were exposed to eye injury while operating pneumatic nail guns without the benefit of eye protection. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1540
- — Z (S) $2439
1926.501 B13
- Issued
- Mar 15, 2018
- Abate by
- Mar 21, 2018
- Penalty
- Initial $4,268 · Current $2,650 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) On or about February 14, 2018, employees were exposed to the hazard of falling approximately 11 feet from the edge of an interior second story floor where fall protection was not provided. b) On or about February 14, 2018, employees were exposed to the hazard of falling approximately 10 feet into an exterior foundation wall pit/well where fall protection was not provided. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2650
- — Z (S) $4268
1926.502 D16 III
- Issued
- Mar 15, 2018
- Penalty
- Initial $3,658 · Current $0 Reduced
General-duty citation text
29 CFR 1926.502(d)(16)(iii): Personal fall arrest systems, when stopping a fall, were not rigged such that an employee could not free fall more than 6 feet (1.8 m) nor contact any lower level: a) On or about February 14, 2018, employees were exposed to the hazard of free falling more than 6 feet and contacting lower levels while using personal fall arrest systems that were not rigged to prevent these hazards. No abatement certification or documentation required for this violation.
Recent events (2)
- — I (S) $0
- — Z (S) $3658
1926.502 D06 I
- Issued
- Mar 15, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(6)(i): Snap hooks were engaged directly to webbing, rope or wire rope when not designed for such connections: a) On or about February 14, 2018, snaphooks used as part of personal fall arrest systems were engaged directly to lifeline ropes when not designed for such connections. No abatement certification or documentation required for this violation.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1052 C01 II
- Issued
- Mar 15, 2018
- Penalty
- Initial $2,439 · Current $1,540 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge: a) On or about February 14, 2018, employees were exposed to fall hazards where a stairway from the main level of the building to the second story was not equipped with a stairrail system along its unprotected sides or edges. No abatement certification or documentation required for this violation.
Recent events (2)
- — I (S) $1540
- — Z (S) $2439
1926.1053 B13
- Issued
- Mar 15, 2018
- Abate by
- Mar 21, 2018
- Penalty
- Initial $3,658 · Current $2,270 Reduced
General-duty citation text
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step: a) On or about February 14, 2018, employees were exposed to the hazard of falling where the top of a step ladder was used as a step to access and egress an upper deck/landing surface of the building. No abatement certification or documentation required for this violation.
Recent events (2)
- — I (S) $2270
- — Z (S) $3658
1926.503 B01
- Issued
- Mar 15, 2018
- Abate by
- May 15, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify fall protection training by preparing a written certification record: a) On or about February 14, 2018, the employer did not prepare written certification records related to employee fall protection training. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Ortega Homes, INC.
View Ortega Homes, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342947413.