NORTHBROOK, IL —
OSHA Inspection: FIVE STARS HIGHLAND CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FIVE STARS HIGHLAND CONSTRUCTION, INC. in 950 CEDAR LN, NORTHBROOK, IL 60062 (NAICS 238130). OSHA activity number 342956075.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FIVE STARS HIGHLAND CONSTRUCTION, INC.
- Site address
- 950 CEDAR LN
- City
- NORTHBROOK
- State
- IL
- ZIP
- 60062
- Mailing
- 7038 W. 74TH ST., CHICAGO, IL 60638
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 6
- Ownership type
- A
Citations
7 citations on file for this inspection.
1903.19 C01
- Issued
- Sep 18, 2018
- Abate by
- Oct 22, 2018
- Penalty
- Initial $311 · Current $311
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Five Stars Highland Construction, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 01 07/02/2018 01 03 07/27/2018 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (O) $311
1926.20 B02
- Issued
- Jun 20, 2018
- Abate by
- Jul 2, 2018
- Penalty
- Initial $5,173 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s): a) On or about February 16, 2018, the employer did not initiate a program which provided for frequent and regular inspections of the job site by a competent person. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2000
- — Z (S) $5173
1926.102 A01
- Issued
- Jun 20, 2018
- Abate by
- Jun 26, 2018
- Penalty
- Initial $3,696 · Current $1,800 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents: a) On February 16, 2018, employees using pneumatic nail guns were not wearing safety glasses, thereby exposing the employees to hazards associated with eye injury. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $1800
- — Z (S) $3696
1926.501 B13
- Issued
- Jun 20, 2018
- Abate by
- Jul 27, 2018
- Penalty
- Initial $5,173 · Current $4,000 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On February 16, 2018, employees sheeting the roof of the home were exposed to fall hazards of approximately 23.1 feet. b) On February 16, 2018, employees were exposed to fall hazards of approximately 15 feet while working around unprotected window openings. c) On February 16, 2018, employees were exposed to fall hazards of approximately 7.3 feet while working around unprotected holes. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $4000
- — Z (S) $5173
1926.1051 A
- Issued
- Jun 20, 2018
- Abate by
- Jun 26, 2018
- Penalty
- Initial $3,696 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.1051(a): Stairways or ladders were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist was provided: a) On February 16, 2018, employees were exposed to fall hazards where a ladder or other safe means was not provided to access the working level. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $2000
- — Z (S) $3696
1926.1052 C01 II
- Issued
- Jun 20, 2018
- Penalty
- Initial $2,956 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one stairrail system along each unprotected side or edge: a) On February 16, 2018, employees were accessing the upper floors of the building by way of stairways that did not have a stairrail system along the unprotected side. No abatement certification or documentation is required for this item.
Recent events (2)
- — I (S) $0
- — Z (S) $2956
1926.503 B01
- Issued
- Jun 20, 2018
- Abate by
- Jul 2, 2018
- Penalty
- Initial $415 · Current $200 Reduced
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer: a) On or about February 16, 2018, the employer did not maintain records or certification of fall protection training for employees exposed to fall hazards. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (O) $200
- — Z (O) $415
More inspections at Five Stars Highland Construction, INC.
View Five Stars Highland Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342956075.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.