OSHA Inspection: METROPOLIS READY MIX, INC. DBA KOTTER REDI-MIX COMPANY

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of METROPOLIS READY MIX, INC. DBA KOTTER REDI-MIX COMPANY in 1200 EAST 2ND STREET, METROPOLIS, IL 62960 (NAICS 488320). OSHA activity number 342972734.

Watch Metropolis Ready MIX, INC. DBA Kotter Redi-Mix Company — free Get an email when a new federal OSHA severe-injury report for Metropolis Ready MIX, INC. DBA Kotter Redi-Mix Company is published. One employer, no account, unsubscribe in one click.
Site address
1200 EAST 2ND STREET
City
METROPOLIS
State
IL
ZIP
62960
Mailing
1200 EAST 2ND STREET, METROPOLIS, IL 62960
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
488320
Employees
15
Ownership type
A

6 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 3, 2018
Abate by
Sep 7, 2018
Penalty
Initial $3,696 · Current $2,402 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:    On or about February 14, 2018, hazardous energy control procedures were not developed for the performance of drive belt changing operations on the conveyor on the river bank.
Recent events (2)
  • — I (S) $2402.35
  • — Z (S) $3696

1910.147 D

Serious Gravity 10 1 instance 1 exposed
Issued
Jul 3, 2018
Abate by
Sep 7, 2018
Penalty
Initial $5,174 · Current $3,363 Reduced
29 CFR 1910.147( d):  The established procedure for the application of energy control (the lockout or tagout procedure) was not done in sequence as required by 29 CFR 1910.147( d)(1) through (d)(6 ):     On or about February 14, 2018, employee was exposed to machine hazards associated with moving parts and in-going nip points during belt changing operations on the belt drive for the conveyor located at the river bank.  The employer failed to implement energy control application steps as LOTO devices were not applied to the electrical disconnect [per the 1910 .147(d)(4) requirements].
Recent events (2)
  • — I (S) $3363.1
  • — Z (S) $5174

1910.305 G02 II

Serious Gravity 10 1 instance 2 exposed
Issued
Jul 3, 2018
Abate by
Jul 30, 2018
Penalty
Initial $5,174 · Current $3,363 Reduced
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap:    A flexible 480 volt cable was used to power the motor on the conveyor.  The cable was spliced with wing nuts and the cable's outer insulation was missing.
Recent events (2)
  • — I (S) $3363.1
  • — Z (S) $5174

1917.111 D

Serious Gravity 10 1 instance 1 exposed
Issued
Jul 3, 2018
Abate by
Jul 30, 2018
Penalty
Initial $5,174 · Current $3,363 Reduced
29 CFR 1917.111(d): All walking and working surfaces in the terminal areas were not maintained in good repair:    On the walkway alongside the conveyor system from the river's edge toward the land, the walkway was broken apart and that section was angled downward, inconsistent with the general slope of the walkway.
Recent events (2)
  • — I (S) $3363.1
  • — Z (S) $5174

1917.112 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Jul 3, 2018
Abate by
Jul 30, 2018
Penalty
Initial $0 · Current $0
29 CFR 1917.112(b)(1): Guardrails were not provided at locations where employees were exposed to floor or wall openings or waterside edges, including bridges or gangway-like structures leading to pilings or vessel mooring or berthing installations, which presented a hazard of falling more than 4 feet or into the water:  On the walkway alongside the conveyor system from the river's edge toward the land, was missing guardrails at heights up to 10 feet.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1904.39 A02

Other-than-serious 1 instance 1 exposed
Issued
Jul 3, 2018
Penalty
Initial $3,696 · Current $2,402 Reduced
29 CFR 1904.39(a)(2): The employer did not report within 24-hours a work-related incident resulting in in-patient hospitalization:    On or about February 14, 2018, an employee received an electrical shock and fell off a 10 foot high walkway.  The employee was hospitalized for 3 days and the employer failed to report the hospitalization.
Recent events (2)
  • — I (O) $2402.35
  • — Z (O) $3696

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342972734.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.