OSHA Inspection: DESIGN/BUILD INC.

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of DESIGN/BUILD INC. in 4405 KLINGLE STREET NW, WASHINGTON, DC 20016 (NAICS 236118). OSHA activity number 343045993.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Design/Build INC. — free Get an email when a new federal OSHA severe-injury report for Design/Build INC. is published. One employer, no account, unsubscribe in one click.
Establishment
DESIGN/BUILD INC.
Site address
4405 KLINGLE STREET NW
City
WASHINGTON
State
DC
ZIP
20016
Mailing
1310 NOYES DRIVE, SILVER SPRING, MD 20910
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236118
Employees
5
Ownership type
A

3 citations on file for this inspection.

1926.451 B01 I

Serious Gravity 10 1 instance 2 exposed
Issued
May 23, 2018
Abate by
Jun 1, 2018
Penalty
Initial $3,880 · Current $2,300 Reduced
29 CFR 1926.451(b)(1)(i): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports so that the space between adjacent units and the space between the platform and the uprights is no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary (for example, to fit around uprights when side brackets are used to extend the width of the platform).    a) On or about February 28, 2018; rear of residential home; the working platform of the scaffold system was not fully planked leaving an estimated 36-inch opening in which the sub-contractor's employee could potentially fall 14-feet to ground level.         In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification.  This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2300
  • — Z (S) $3880

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
May 23, 2018
Abate by
Jun 1, 2018
Penalty
Initial $3,880 · Current $2,300 Reduced
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.    a) On or about February 28, 2018; rear area of the residential building; sub-contractor's employees were not protected from falling 14-feet to ground level or 24-feet to basement area, while working on the scaffold system erected to remove the chimney system.       In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification.  This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2300
  • — Z (S) $3880

1926.501 B13

Serious Gravity 10 1 instance 1 exposed
Issued
May 23, 2018
Abate by
Jun 1, 2018
Penalty
Initial $3,880 · Current $2,300 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):     a) On or about February 28, 2018; rear area of the building; sub-contractor's employee while using a Bosch Hammer Drill, with chisel attachment, to chip away the concrete wall was exposed to a fall hazard of 10 to 12-feet to ground level.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification.  This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2300
  • — Z (S) $3880

View Design/Build INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343045993.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.