PROSPECT HEIGHTS, IL —
OSHA Inspection: EVERLAST CONSTRUCTION INCORPORATED
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of EVERLAST CONSTRUCTION INCORPORATED in 198 N. ELMHURST ROAD, PROSPECT HEIGHTS, IL 60070 (NAICS 238160). OSHA activity number 343112652.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- EVERLAST CONSTRUCTION INCORPORATED
- Site address
- 198 N. ELMHURST ROAD
- City
- PROSPECT HEIGHTS
- State
- IL
- ZIP
- 60070
- Mailing
- 3818 RUBY STREET #3W, SCHILLER PARK, IL 60176
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 4
- Ownership type
- A
Citations
6 citations on file for this inspection.
1903.19 C01
- Issued
- Oct 25, 2018
- Abate by
- Nov 29, 2018
- Penalty
- Initial $311 · Current $211 Reduced
General-duty citation text
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Everlast Construction Incorporated, failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected: Citation Number Item Number Abatement Date 01 02 08/08/2018 01 03 08/08/2018 02 01 08/28/2018 In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (O) $211
- — Z (O) $311
1926.28 A
- Issued
- Aug 2, 2018
- Penalty
- Initial $3,326 · Current $3,326
General-duty citation text
29 CFR 1926.28(a): Appropriate personal protective equipment was not worn by employee(s) in all operations where there was exposure to hazardous conditions: a) On or about April 25, 2018, employees were not provided with appropriate foot protection to guard against punctures and lacerations to the feet when required to work on and in roofing debris containing nails. No abatement certification or documentation required for this violation.
Recent events (1)
- — Z (S) $3326
1926.300 B02
- Issued
- Aug 2, 2018
- Abate by
- Aug 8, 2018
- Penalty
- Initial $2,217 · Current $2,217
General-duty citation text
29 CFR 1926.300(b)(2): Moving part(s) of equipment exposed to contact by employees or which otherwise created a hazard, were not guarded: a) On or about April 25, 2018, the belt and pulley on a ladder hoist used to hoist materials to the roof deck was not guarded to prevent contact with moving parts. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2217
1926.552 A01
- Issued
- Aug 2, 2018
- Abate by
- Aug 8, 2018
- Penalty
- Initial $2,772 · Current $2,772
General-duty citation text
29 CFR 1926.552(a)(1): The employer did not comply with the manufacturer's specifications and limitations applicable to the operation of all hoists and elevators: a) On or about April 25, 2018, a material hoist was used for climbing to reach the roof surface where roofing work was being conducted. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (S) $2772
1926.501 B13
- Issued
- Aug 2, 2018
- Penalty
- Initial $3,880 · Current $3,880
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b): a) On or about April 25, 2018, employees were exposed to the hazard of falling while working without fall protection from pitched roof surfaces having a ground to eave height of approximately 23 feet. No abatement certification or documentation required for this violation.
Recent events (1)
- — Z (S) $3880
1926.503 B01
- Issued
- Aug 2, 2018
- Abate by
- Aug 28, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify fall protection training by preparing a written certification record: a) On or about April 25, 2018, the employer did not prepare written certification records related to employee fall protection training. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
- — Z (O) $0
More inspections at Everlast Construction Incorporated
View Everlast Construction Incorporated's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343112652.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.