Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PANTALEON MORALES HERNANDEZ

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of PANTALEON MORALES HERNANDEZ in 1629 ITZIA CT, LEAGUE CITY, TX 77573 (NAICS 238140). OSHA activity number 343140869.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pantaleon Morales Hernandez — free Get an email when a new federal OSHA severe-injury report for Pantaleon Morales Hernandez is published. One employer, no account, unsubscribe in one click.
Site address
1629 ITZIA CT
City
LEAGUE CITY
State
TX
ZIP
77573
Mailing
2209 WILLIAM TELL ST, HOUSTON, TX 77093
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
3
Ownership type
A

3 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 3 exposed
Issued
May 16, 2018
Abate by
Jun 5, 2018
Penalty
Initial $3,880 · Current $3,880
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights was less than 1 inch:   a)  At 1629 Itzia Court, League City, Texas: The working level of a tubular welded scaffold was not fully planked and decked between the uprights, exposing employees to fall hazards.
Recent events (1)
  • — Z (S) $3880

1926.451 E01

Serious Gravity 10 1 instance 3 exposed
Issued
May 16, 2018
Abate by
Jun 5, 2018
Penalty
Initial $3,880 · Current $3,880
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access:  a) At 1629 Itzia Court, League City, Texas: Tubular welded frame scaffolding was not equipped with a ladder.  Cross bracing was used as a means of access.
Recent events (1)
  • — Z (S) $3880

1926.451 G01 VII

Serious Gravity 10 1 instance 3 exposed
Issued
May 16, 2018
Abate by
Jun 5, 2018
Penalty
Initial $3,880 · Current $3,880
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above a lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:  a)  At 1629 Itzia Court, League City, Texas: The working level of tubular welded frame scaffolding, approximately 18 feet above the ground, was not equipped with guardrails.
Recent events (1)
  • — Z (S) $3880

View Pantaleon Morales Hernandez's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343140869.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.