WASHINGTON, DC —
OSHA Inspection: MARTIN GARCIA LOPEZ
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MARTIN GARCIA LOPEZ in 3636 JAMISON STREET NE, WASHINGTON, DC 20018 (NAICS 238130). OSHA activity number 343152112.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MARTIN GARCIA LOPEZ
- Site address
- 3636 JAMISON STREET NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 7315 OLIVER STREET, LANHAM, MD 20706
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 3
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.102 A01
- Issued
- Aug 6, 2018
- Abate by
- Aug 13, 2018
- Penalty
- Initial $3,880 · Current $3,880
General-duty citation text
29 CFR 1926.102(a)(1): 29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles. a) On or about May 2, 2018; roof area; employees were exposed to a struck by hazard while operating Paslode pneumatic nail guns without wearing eye protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $3880
1926.501 B13
- Issued
- Aug 6, 2018
- Abate by
- Aug 13, 2018
- Penalty
- Initial $3,880 · Current $3,880
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) On or about May 2, 2018; roof area; employees were walking the top-plate and trusses without fall protection exposing them to a fall hazard of 13-feet in the rear or 10-feet in the front of the house under construction. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $3880
1926.1053 B01
- Issued
- Aug 6, 2018
- Abate by
- Aug 13, 2018
- Penalty
- Initial $3,880 · Current $3,880
General-duty citation text
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed: a) On or about May 2, 2018; roof area; employees were using a 20-foot extension ladder to access the top of a 10-foot structure and the ladder was only extended 18-inches above the landing. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
- — Z (S) $3880
1926.503 B01
- Issued
- Aug 6, 2018
- Abate by
- Aug 13, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. a) On or about May 2, 2018; roof area; the employer did not document fall protection training to employees exposed to fall hazards while performing framing operations at elevations greater than six feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (1)
- — Z (O) $0
More inspections at Martin Garcia Lopez
View Martin Garcia Lopez's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343152112.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.