OSHA Inspection: EMMANUEL MARTINEZ-MENDOZA DBA MCI REMODELING, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of EMMANUEL MARTINEZ-MENDOZA DBA MCI REMODELING, INC. in 1738 N. BEVERLY LANE, ARLINGTON HEIGHTS, IL 60004 (NAICS 238160). OSHA activity number 343166609.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Emmanuel Martinez-Mendoza DBA MCI Remodeling, INC. — free Get an email when a new federal OSHA severe-injury report for Emmanuel Martinez-Mendoza DBA MCI Remodeling, INC. is published. One employer, no account, unsubscribe in one click.
Site address
1738 N. BEVERLY LANE
City
ARLINGTON HEIGHTS
State
IL
ZIP
60004
Mailing
1123 CARDINAL DRIVE, ALGONQUIN, IL 60102
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
5
Ownership type
A

6 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Sep 27, 2018
Abate by
Oct 31, 2018
Penalty
Initial $311 · Current $0 Reduced
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     Emmanuel Martinez-Mendoza dba MCI Remodeling, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:       Citation Number            Item Number                    Abatement Date     02                                01                                 07/31/2018      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $311

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
May 21, 2018
Abate by
May 25, 2018
Penalty
Initial $2,217 · Current $1,220 Reduced
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:           a) On or about May 17, 2018, employees were exposed to head injury while working without protective helmets in areas below hoisting and roofing operations.          In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1220
  • — Z (S) $2217

1926.501 B13

Serious Gravity 10 5 instances 5 exposed
Issued
May 21, 2018
Abate by
May 25, 2018
Penalty
Initial $3,880 · Current $2,140 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):                   a) On or about May 17, 2018, employees were exposed to the hazard of falling while working without fall protection from pitched roof surfaces having ground to eave heights ranging from between 9 and 19 feet.           In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2140
  • — Z (S) $3880

1926.1053 B01

Serious Gravity 5 1 instance 5 exposed
Issued
May 21, 2018
Penalty
Initial $2,217 · Current $1,220 Reduced
29 CFR 1926.1053(b)(1): Where (a) portable ladder(s) was/were used for access to an upper level landing surface and the ladder's length did not allow the ladder side rails to extend at least 3 feet (0.9 m) above the upper landing surface being accessed, the ladder was not secured at its top to a rigid support that will not deflect, and/or a grasping device was not provided to assist employees in mounting and dismounting the ladder:         a) On or about May 17, 2018, employees were exposed to the hazard of falling approximately 9 feet where a portable extension ladder did not extend at least 3 feet above the landing surface of the roof deck.            No abatement certification or documentation required for this violation.
Recent events (2)
  • — I (S) $1220
  • — Z (S) $2217

1926.1053 B16

Serious Gravity 5 3 instances 5 exposed
Issued
May 21, 2018
Penalty
Initial $2,217 · Current $1,220 Reduced
29 CFR 1926.1053(b)(16): Portable ladders with structural defects, such as, but not limited to, broken or missing rungs, cleats, or steps, broken or split rails, corroded components, or other faulty or defective components, were not either immediately marked in a manner that readily identifies them as defective, or tagged with "Do Not Use" or similar language, and were not withdrawn from service until repaired:         a) On or about May 17, 2018, a portable extension ladder was provided for use with broken feet and rungs.         No abatement certification or documentation required for this violation.
Recent events (2)
  • — I (S) $1220
  • — Z (S) $2217

1926.503 B01

Other-than-serious 5 instances 5 exposed
Issued
May 21, 2018
Abate by
Jul 31, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.503(b)(1): The employer did not verify fall protection training by preparing a written certification record:            a) On or about May 17, 2018, the employer did not prepare written certification records related to employee fall protection training.           In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343166609.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.