OSHA Inspection: SECO ARCHITECTURAL SYSTEMS, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SECO ARCHITECTURAL SYSTEMS, INC. in 22 14TH STREET NW, ATLANTA, GA 30309 (NAICS 238170). OSHA activity number 343245320.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Seco Architectural Systems, INC. — free Get an email when a new federal OSHA severe-injury report for Seco Architectural Systems, INC. is published. One employer, no account, unsubscribe in one click.
Site address
22 14TH STREET NW
City
ATLANTA
State
GA
ZIP
30309
Mailing
3685 HEWATT COURT, SUITE E, SNELLVILLE, GA 30039
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
70
Ownership type
A

2 citations on file for this inspection.

1926.451 F06

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 14, 2018
Penalty
Initial $9,054 · Current $5,432 Reduced
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6):  (a) ICON Midtown Luxury Apartments, 37th floor of the Northeast Corner: On or about 05/18/2018, and at times prior, the employer exposed employees to electrical shock hazards, in that the swing stage scaffold used to install decorative metal panels was not kept at least 12-feet, 2-inches from the 115kv power transmission lines at street level. The wire support cables of the swing stage came in close proximity to the high power lines which created two explosions and a scaffold collapse on the right side of the swing stage platform.
Recent events (2)
  • — I (S) $5432.4
  • — Z (S) $9054

1926.451 F07

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 14, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:   a) ICON Midtown Luxury Apartments, 37th floor of the Northeast Corner: On or about 05/18/2018, and at times prior, the employer exposed employees to electrical shock hazards while moving and working from a swing stage scaffold system, in that the competent person or experienced and/or trained employees failed to keep the scaffold system a safe distance away from high powered transmission lines.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Seco Architectural Systems, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343245320.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.