WASHINGTON, DC —
OSHA Inspection: THE RAMOS CONSTRUCTION GROUP, LTD
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of THE RAMOS CONSTRUCTION GROUP, LTD in 1401 SOUTH CAROLINA AVENUE, SE, WASHINGTON, DC 20003 (NAICS 238140). OSHA activity number 343290623.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- THE RAMOS CONSTRUCTION GROUP, LTD
- Site address
- 1401 SOUTH CAROLINA AVENUE, SE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20003
- Mailing
- 20914 CLARKSBURG ROAD, BOYDS, MD 20841
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 3
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.451 B01
- Issued
- Aug 31, 2018
- Abate by
- Sep 7, 2018
- Penalty
- Initial $3,049 · Current $1,475 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Exterior, NW Corner of Building - Employees were observed standing on a tubular welded frame scaffold work platform and the platform was not solidly planked, on or about 07/10/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (3)
- — F (S) $1475
- — C (S) $3049
- — Z (S) $3049
1926.451 C02
- Issued
- Aug 31, 2018
- Abate by
- Sep 7, 2018
- Penalty
- Initial $2,439 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: a) Exterior NW Corner of Building - Employees were standing on a tubular welded frame scaffold work platform during a masonry operation and two of the scaffold legs were not provided with a base plate, on or about 07/10/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (3)
- — F (S) $1000
- — C (S) $2439
- — Z (S) $2439
1926.451 C03
- Issued
- Aug 31, 2018
- Abate by
- Sep 7, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, post, frames, and/or uprights were not plumb and braced to prevent swaying and displacement: a) Exterior, NW Corner of Building - Employees were standing on a tubular welded frame scaffold work platform while performing a brick laying operation and the poles of the scaffold were out of plumb by approximately one foot, on or about 07/10/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.454 A
- Issued
- Aug 31, 2018
- Abate by
- Sep 13, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: a) Exterior - Employee was performing masonry work operations while on a tubular welded frame scaffold and had not been trained to be aware of hazards such as but not limited to; working from a fully planked platform, base plates were missing from the legs, scaffold was not plumb, safe access to the work platform was not provided, and not provided with fall protection, on or about 07/10/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (3)
- — F (S) $0
- — C (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- Aug 31, 2018
- Abate by
- Sep 7, 2018
- Penalty
- Initial $2,439 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. Crossbraces were used as a means of access: a) Exterior, NW Corner of Building - Employees were using the cross bracing on a tubular welded frame scaffold to ascend and descend to the scaffold work platform that was 18 feet above the ground, on or about 07/10/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (3)
- — F (S) $1000
- — C (S) $2439
- — Z (S) $2439
1926.451 G01
- Issued
- Aug 31, 2018
- Abate by
- Sep 7, 2018
- Penalty
- Initial $3,049 · Current $1,475 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a) Exterior, NW Corner of Building - Employees were observed standing on a tubular welded frame scaffold work platform 18 feet above the ground and not provided with fall protection, on or about 07/10/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (3)
- — F (S) $1475
- — C (S) $3049
- — Z (S) $3049
More inspections at The Ramos Construction Group, LTD
View The Ramos Construction Group, LTD's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343290623.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.