Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: FCR CONCRETE INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FCR CONCRETE INC. in 7855 NW 104TH AVE APEX PHASE II, BUILDING 11, DORAL, FL 33178 (NAICS 238140). OSHA activity number 343308219.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch FCR Concrete INC. — free Get an email when a new federal OSHA severe-injury report for FCR Concrete INC. is published. One employer, no account, unsubscribe in one click.
Establishment
FCR CONCRETE INC.
Site address
7855 NW 104TH AVE APEX PHASE II, BUILDING 11
City
DORAL
State
FL
ZIP
33178
Mailing
1834 NW 22ND CT APT 4, MIAMI, FL 33125
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
7
Ownership type
A

8 citations on file for this inspection.

1926.95 A

Serious Gravity 5 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $2,772 · Current $1,663 Reduced
29 CFR 1926.95(a): Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, was not provided, used, or maintained in a sanitary and reliable condition it was necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation, or physical contact.    On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, employees performing overhand bricklaying were exposed to chemical burns while using Portland Cement without appropriate hand protection.
Recent events (2)
  • — I (S) $1663.2
  • — Z (S) $2772

1926.451 B01

Serious Gravity 10 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $3,880 · Current $2,328 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii)    On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, employees performing overhand bricklaying were exposed to fall hazards while working from a 10 foot 3 inch scaffold that was lacking planks to fully deck the working surface.
Recent events (2)
  • — I (S) $2328
  • — Z (S) $3880

1926.451 C02

Serious Gravity 10 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation:  On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, employees performing overhand bricklaying were exposed to a 14 foot 8 inch fall hazard while working from a scaffold in which the frame was supported by a partially erected brick wall; and two of the poles/leg posts were left unsupported.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 G01 VI

Serious Gravity 10 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1)(vi): Each employee performing overhand bricklaying operations from a supported scaffold was not protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound toprail capacity).  On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, employees performing overhand bricklaying were exposed to fall hazards while working from a 10 foot 3 inch high scaffold without means of fall protection on its ends and open sides.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B01

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $3,880 · Current $2,328 Reduced
29 CFR 1926.501(b)(1): Each employee on a walking/working surface having an unprotected side or edge which was six or more feet (1.8m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or persons:     On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, an employee while carrying a wooden plank was exposed to approximately 10 feet fall hazards while walking along the edge of a concrete wall without any means of fall protection.
Recent events (2)
  • — I (S) $2328
  • — Z (S) $3880

1910.1200 E01

Serious Gravity 5 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $2,772 · Current $1,663 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: (Construction Reference: 1926.59)    On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, the employer did not develop or implement a written hazard communication program to address hazards related to chemicals such as but not limited to Portland Cement, for employees performing overhand bricklaying.
Recent events (2)
  • — I (S) $1663.2
  • — Z (S) $2772

1910.1200 G10

Serious Gravity 1 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(10): The employer did not ensure that, in all cases, the required information was provided for each hazardous chemical, and was readily accessible during each work shift to employees when they were in their work area(s): (Construction Reference: 1926.59)  On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, employer did not maintain accessible SDS for all chemicals in the work area for employees performing overhand bricklaying.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 G10

Serious Gravity 1 1 instance 7 exposed
Issued
Dec 18, 2018
Abate by
Jan 15, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(10): The employer did not ensure that, in all cases, the required information was provided for each hazardous chemical, and was readily accessible during each work shift to employees when they were in their work area(s): (Construction Reference: 1926.59)  On or about July 17, 2018, at jobsite located on 7855 NW 104th Ave, Apex Phase II, Building 11, Doral FL 33178, employer did not provide effective training on hazards associate to chemicals, such as but not limited to Portland Cement, for employees performing overhand bricklaying.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343308219.