Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ELITE STONE & SUPPLY, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ELITE STONE & SUPPLY, LLC in 612 INDIGO COURT, WOODSTOCK, GA 30188 (NAICS 238140). OSHA activity number 343396610.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Elite Stone & Supply, LLC — free Get an email when a new federal OSHA severe-injury report for Elite Stone & Supply, LLC is published. One employer, no account, unsubscribe in one click.
Site address
612 INDIGO COURT
City
WOODSTOCK
State
GA
ZIP
30188
Mailing
9 BAKER RD. SE, CARTERSVILLE, GA 30121
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

6 citations on file for this inspection.

1926.100 A

Serious Gravity 5 2 instances 1 exposed
Issued
Nov 6, 2018
Penalty
Initial $3,326 · Current $1,996 Reduced
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets.  On or about June 18, 2018 at 612 Indigo Court, Woodstock, Georgia:  a) an employee passing mud up to the worker on the upper level was not wearing a hard hat to protect him from falling debris.  b)  an employee engaged in masonry work was working beneath another employee while not wearing a hard hat to protect him from falling debris, tools, or other material.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1995.6
  • — Z (S) $3326

1926.405 G02 III

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 6, 2018
Abate by
Dec 4, 2018
Penalty
Initial $2,217 · Current $1,330 Reduced
29 CFR 1926.405(g)(2)(iii): The repair splice in a hard service flexible cord No. 12 or larger did not retain the insulation, outer sheath properties, and usage characteristics of the cord which was being used.  On or about June 18, 2018 at 612 Indigo Court, Woodstock, Georgia, an employee working with the electrical mixer was exposed to an electrical shock hazard when a proper splice/repair was not made to the mixer electrical cord.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1330.2
  • — Z (S) $2217

1926.451 B01

Serious Gravity 10 1 instance 3 exposed
Issued
Nov 6, 2018
Abate by
Nov 27, 2018
Penalty
Initial $3,880 · Current $2,328 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no than 1 inch wide.  On or about June 18, 2018 at 612 Indigo Court, Woodstock, Georgia:   a) workers working from the second and third level of a tubular welded frame scaffolding installing stone on the side of the residence did not have each working level fully decked.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2328
  • — Z (S) $3880

1926.451 C02

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 6, 2018
Abate by
Dec 4, 2018
Penalty
Initial $2,217 · Current $1,330 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation.  On or about June 18, 2018 at 612 Indigo Court, Woodstock, Georgia, employees were on a tubular framed scaffold installing split brick on the outside of the residence. The scaffold legs did not rest on base plates, mud sills, or any other adequate support.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1330.2
  • — Z (S) $2217

1926.451 F07

Serious Gravity 10 4 instances 4 exposed
Issued
Nov 6, 2018
Abate by
Dec 4, 2018
Penalty
Initial $3,880 · Current $2,328 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.    On or about June 18, 2018 at 612 Indigo Court, Woodstock, Georgia, when employees engaged in masonry work; a competent person was not available to direct and supervise the erection of the scaffolding.  The following discrepancies existed at the time of the inspection to include, but not limited to the following:    a.  the working levels were not fully planked.    b. a ladder was not provided of a safe means of access/egress.    c.  all scaffold legs did not rest on base plates, mud sill, or other adequate support.    d.  there were no guard rails or end rails.
Recent events (2)
  • — I (S) $2328
  • — Z (S) $3880

1926.451 G01 V

Serious Gravity 10 1 instance 4 exposed
Issued
Nov 6, 2018
Abate by
Dec 4, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1)(v): Each employee on a walkway located within a scaffold was not protected by a guardrail system (with a minimum 200 pound toprail capacity) installed within 9.5 inches (24.1 cm) of and along at least one side of the walkway.    On or about June 18, 2018 at 612 Indigo Court, Woodstock, Georgia, employees working on a tubular welded frame scaffold were exposed to a fall hazard of more than 10 feet to the lower level when the guard rails were not properly installed on each of the working levels.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Elite Stone & Supply, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343396610.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.