OSHA Inspection: DAVID SILVA JR.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DAVID SILVA JR. in 231 TANZANIA TRAIL LOT 365, POOLER, GA 31322 (NAICS 238170). OSHA activity number 343407060.

Watch David Silva JR. — free Get an email when a new federal OSHA severe-injury report for David Silva JR. is published. One employer, no account, unsubscribe in one click.
Establishment
DAVID SILVA JR.
Site address
231 TANZANIA TRAIL LOT 365
City
POOLER
State
GA
ZIP
31322
Mailing
237 AMY DRIVE, GOOSE CREEK, SC 29445
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
3
Ownership type
A

4 citations on file for this inspection.

1926.451 G01 VII

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $2772.00
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section:    a)    On pump-jack scaffolds: On or about August 17, 2018, and at times prior thereto, employees were exposed to fall hazards of 13 ft., in that a personal fall-arrest system or guardrail system was not engaged on all open sides and ends of platforms while performing siding activities.
Recent events (1)
  • — Z (S) $2772

1926.454 A

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazard:   a)    On pump-jack scaffolds: On or about August 17, 2018, and at times prior thereto, employees were exposed to fall hazards of 10-13 ft., in that employees working on, and involved in erecting, movement, and dismantling of scaffolds was not trained by a qualified person to control and minimize the hazards associated with such work.
Recent events (1)
  • — Z (S) $0

1926.452 J02

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $2772.00 · Current $2772.00
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary:   a)    On pump-jack scaffolds: On or about August 17, 2018, and at times prior thereto, employees were exposed to fall hazards of 13 ft., in that poles were not secured to rigid-triangular bracing at the bottoms as employees engaged in siding activities.
Recent events (1)
  • — Z (S) $2772

1926.451 F07

Serious Gravity 5 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $0.00 · Current $0.00
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person:   a)    On pump-jack scaffolds: On or about August 17, 2018, and at times prior thereto, the employer failed to ensure that scaffolds were erected and moved under the supervision of a competent person, and that employees were trained and experienced in such work.