OSHA Inspection: REDDY ICE CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of REDDY ICE CORPORATION in 7901 SPRINGDALE ROAD, AUSTIN, TX 78724 (NAICS 312113). OSHA activity number 343449542.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Reddy ICE Corporation — free Get an email when a new federal OSHA severe-injury report for Reddy ICE Corporation is published. One employer, no account, unsubscribe in one click.
Site address
7901 SPRINGDALE ROAD
City
AUSTIN
State
TX
ZIP
78724
Mailing
7901 SPRINGDALE ROAD, AUSTIN, TX 78724
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
312113
Employees
26
Ownership type
A

11 citations on file for this inspection.

1910.29 B13

Serious Gravity 5 1 instance 3 exposed
Issued
Jan 23, 2019
Penalty
Initial $10,419 · Current $6,000 Reduced
29 CFR 1910.29(b)(13): When guardrail systems are used around holes that serve as points of access (such as ladderways), the guardrail system opening did not meet the requirements (b)(13)(i) or (b)(13)(ii) of this section.    On or about 4 September 2018, and at times prior thereto, three rooftop evaporative condensers had fixed ladders where the ladderway opening was unguarded, exposing employees to a fall hazard of approximately 40 feet to the pavement below.
Recent events (2)
  • — I (S) $6000
  • — Z (S) $10419

1910.36 D01

Serious Gravity 1 1 instance 3 exposed
Issued
Jan 23, 2019
Abate by
Feb 28, 2019
Penalty
Initial $6,251 · Current $3,500 Reduced
29 CFR 1910.36(d)(1): Employees were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge. A device such as a panic bar that locks only from the outside is permitted on exit discharge doors.    Engine Rm, east exit door requires key to unlock and exit.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $6251

1910.119 F01 III B

Serious Gravity 1 1 instance 3 exposed
Issued
Jan 23, 2019
Penalty
Initial $6,251 · Current $3,500 Reduced
29 CFR 1910.119(f)(1)(iii)(B): The employer failed to ensure that the Process Safety Management Standard Operating Procedures included safety and health consideration precautions necessary to prevent exposure, including engineering controls, administrative controls, and personal protective equipment.    On or about 4 September 2018, and at times prior thereto, the employer did not ensure the King Valve for the High Pressure Receiver was readily accessible in order to implement the shutdown procedure in the event of an emergency. The valve was identified by signage but is located on top of the Receiver with no ladder or platform to reach the valve.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $6251

1910.119 L04

Other-than-serious 1 instance 3 exposed
Issued
Jan 23, 2019
Penalty
Initial $6,251 · Current $3,500 Reduced
29 CFR 1910.119(l)(4): If a change covered by this paragraph results in a change in the process safety information required by paragraph (d) of this section, such information was not updated accordingly.    On or about 4 September 2018, and at times prior thereto, the employer did not ensure the process safety information was updated accordingly from a management of change on an ammonia covered process equipment. The system was upgraded from a 14-ton IMECO Air Handling Unit to a 17-ton Krack Air Handling Unit without updating the Piping & Instrumentation Diagrams (P&ID's).
Recent events (2)
  • — I (O) $3500
  • — Z (S) $6251

1910.119 L05

Other-than-serious 1 instance 3 exposed
Issued
Jan 23, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.119(l)(5): A change covered by this paragraph resulted in a change in the operating procedures or practices required by paragraph (f) of this section, and such procedures or practices were not updated accordingly.    On or about 4 September 2018, and at times prior thereto, the employer did not ensure the standard operating procedure for a storage freezer evaporator was updated accordingly from a management of change on ammonia covered process equipment.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.119 N

Serious Gravity 1 1 instance 26 exposed
Issued
Jan 23, 2019
Abate by
Feb 28, 2019
Penalty
Initial $6,251 · Current $3,500 Reduced
29 CFR 1910.119(n): The employer did not implement an emergency plan for the entire plant in accordance with the provisions of 29 CFR 1910.38:(a).    Lack of windsocks for wind direction indication during emergency release incidents; Lack of interlocked, visual alarm to warn of unsafe conditions in the Engine Room.
Recent events (2)
  • — I (S) $3500
  • — Z (S) $6251

1910.119 D03 I D

Serious Gravity 1 1 instance 26 exposed
Issued
Jan 23, 2019
Abate by
Feb 28, 2019
Penalty
Initial $31,257 · Current $9,500 Reduced
29 CFR 1910.119(d)(3)(i)(D): The employer did not include, in the process safety information compilation, the relief system design and the design basis.     01/06:  Pressure relief system will be documented in safe working condition through weekly verification of open vales and clear relief exits.
Recent events (2)
  • — I (S) $9500
  • — Z (R) $31257

1910.119 D03 I D

Serious Gravity 5 1 instance 12 exposed
Issued
Jan 23, 2019
Abate by
Oct 31, 2019
Penalty
Initial $9,500 · Current $9,500
29 CFR 1910.119(d)(3)(i)(D): The employer did not include, in the process safety information compilation, the relief system design and the design basis.     Pressure relief system to be in accordance with recognized and accepted good engineering practices to include the design, design basis, calculations and assumptions compiled for reference.
Recent events (2)
  • — I (S) $9500
  • — Z (S) $9500

1910.119 O04

Serious Gravity 5 2 instances 3 exposed
Issued
Jan 23, 2019
Abate by
Feb 28, 2019
Penalty
Initial $52,096 · Current $10,500 Reduced
29 CFR 1910.119(o)(4): The employer did not promptly determine and document an appropriate response to each of the findings of the compliance audit, and document that deficiencies have been corrected.     Compliance audits will be reviewed for critical items and interim safety measures documented for critical items; a plan for resolution of all items will be developed for reference and tracking.
Recent events (2)
  • — I (S) $10500
  • — Z (R) $52096

1910.119 O04

Serious Gravity 5 1 instance 12 exposed
Issued
Jan 23, 2019
Abate by
Oct 31, 2019
Penalty
Initial $10,500 · Current $10,500
29 CFR 1910.119(o)(4): The employer did not promptly determine and document an appropriate response to each of the findings of the compliance audit, and document that deficiencies have been corrected.     Compliance audit findings from 2014 were not resolved; evaluation of materials of construction, relief header design, ventilation design analysis and mechanical integrity program shall be completed.
Recent events (2)
  • — I (S) $10500
  • — Z (S) $10500

1910.119 O04

Serious Gravity 5 1 instance 12 exposed
Issued
Jan 23, 2019
Abate by
Oct 31, 2019
Penalty
Initial $10,500 · Current $10,500
29 CFR 1910.119(o)(4): The employer did not promptly determine and document an appropriate response to each of the findings of the compliance audit, and document that deficiencies have been corrected.     Compliance audit findings from 2017 were not resolved; evaluation of contractor qualification programs, emergency preparedness and shower station(s), and expert analysis of thickness testing/x-ray testing of process components shall be completed.
Recent events (2)
  • — I (S) $10500
  • — Z (S) $10500

View Reddy ICE Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343449542.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.