OSHA Inspection: DANIEL K BLANK

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DANIEL K BLANK in 5245 HOPPENVILLE ROAD, GREEN LANE, PA 18054 (NAICS 238170). OSHA activity number 343539185.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Daniel K Blank for free Get an email when a new federal OSHA severe-injury report for Daniel K Blank is published. One employer, no account, unsubscribe in one click.
Establishment
DANIEL K BLANK
Site address
5245 HOPPENVILLE ROAD
City
GREEN LANE
State
PA
ZIP
18054
Mailing
120 FAIRVIEW ROAD, OXFORD, PA 19363
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
1
Ownership type
Private (A)

2 citations on file for this inspection.

1926.451 G04 I

Serious Gravity 5 2 instances 1 exposed
Issued
Oct 24, 2018
Abate by
Nov 8, 2018
Penalty
Initial $2,772 · Current $1,772 Reduced
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews:    a) Alumi-Pole Pump Jack Scaffolding System: On or about October 16, 2018 a guardrail system was not installed on both ends of the scaffold platform that was positioned more than 10 feet above ground level.    b) Alumi-Pole Pump Jack Scaffolding System: On or about October 16, 2018 a mid-rail was not installed halfway between the platform and the top-rail on the open side away from the building structure.
Recent events (2)
  • · I (S) $1772
  • · Z (S) $2772

1926.452 J02

Serious Gravity 5 2 instances 1 exposed
Issued
Oct 24, 2018
Abate by
Nov 8, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary.  a) Alumi-Pole Pump Jack Scaffolding System: On or about October 16, 2018 vertical poles were not secured at the bottom to prevent lateral movement.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0