Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,201Inspections Most recent open 2026-08-31 Last loaded 2026-09-03

OSHA Inspection: CAPITAL RESTORATION & WATERPROOFING, INC.

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of CAPITAL RESTORATION & WATERPROOFING, INC. in 508 FULTON STREET DURHAM VAMC, DURHAM, NC 27707 (NAICS 238110). OSHA activity number 343543658.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Capital Restoration & Waterproofing, INC. for free Get an email when a new federal OSHA severe-injury report for Capital Restoration & Waterproofing, INC. is published. One employer, no account, unsubscribe in one click.
Site address
508 FULTON STREET DURHAM VAMC
City
DURHAM
State
NC
ZIP
27707
Mailing
2630 ROWLAND ROAD, RALEIGH, NC 27615
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238110
Employees
15
Ownership type
Private (A)

2 citations on file for this inspection.

1910.1200 E01

Serious Gravity 1 1 instance 7 exposed
Issued
Nov 14, 2018
Penalty
Initial $2,217 · Current $1,330 Reduced
29 CFR 1910.1200(e)(1):  Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, material safety data sheets, and employee information and training will be met, and which also includes the following:   Durham VAMC, Garage A Project:  On or about October 18, 2018, the employer did not implement and establish a written hazard communication or GHS written program for employees engaged in the use or exposed to chemical products such as, but not limited to concrete dust, concrete mix, diesel fuel and gasoline.   CORRECTED DURING THE INSPECTION
Recent events (2)
  • · I (S) $1330.2
  • · Z (S) $2217

1910.305 G02 III

Other-than-serious 1 instance 4 exposed
Issued
Nov 14, 2018
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(2)(iii):  Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws:     Durham VAMC, Garage A Project:  On or about October 18, 2018, the employer did not ensure that an electric Boschhammer drill being used in a wet location was removed from service where the power cord strain relief had pulled away from the tool's end plug thereby exposing internal conductors.   CORRECTED DURING INSPECTION
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 343543658.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.