LUTZ, FL —
OSHA Inspection: KYGO MASONRY, LLC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of KYGO MASONRY, LLC. in 25442 SIERRA CENTER BLVD, LUTZ, FL 33559 (NAICS 238140). OSHA activity number 343555900.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- KYGO MASONRY, LLC.
- Site address
- 25442 SIERRA CENTER BLVD
- City
- LUTZ
- State
- FL
- ZIP
- 33559
- Mailing
- 1 RIVER RIDGE BLVD., TROY, AL 36079
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 8
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.451 B01
- Issued
- Mar 11, 2019
- Penalty
- Initial $3,978 · Current $1,989 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about 10/24/2018, at the jobsite, the supervisor and subcontractor employees were installing clay bricks and foam board while working from a 3 tiered tubular welded scaffolding that was not fully planked on the working levels.
Recent events (2)
- — I (S) $1989
- — Z (S) $3978
1926.451 B04
- Issued
- Mar 11, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(4): Each end of a platform, not cleated or otherwise restrained by hooks or equivalent means, did not extend over the centerline of its support at least 6 inches (15 cm): a. On or about 10/24/2018, at the jobsite, the wood planks on the 3 tiered tubular welded scaffold did not extend the required 6 inches past the centerline of the scaffold support beam.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B05 II
- Issued
- Mar 11, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilivered end: a. On or about 10/24/2018, at the jobsite, the wood planks on the 3 tiered tubular welded scaffold the planks on the top working tier were not secured in place and the planks were over 10 feet long and the ends extended a few feet past the frame support beam.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.452 C02
- Issued
- Mar 11, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(c)(2): Tubular welded frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which would have secured vertical members together laterally: a. On or about 10/24/2018, at the jobsite, the tubular welded scaffolding employees were working from was missing cross, horizontal and diagonal bracing.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 H02 II
- Issued
- Mar 11, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: a. On or about 10/24/2018, at the jobsite, the working level of a 3 tiered tubular welded scaffolding did not have toes boards installed.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 F03
- Issued
- Mar 11, 2019
- Penalty
- Initial $3,978 · Current $1,989 Reduced
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a. On or about 10/24/2018, at the jobsite, the supervisor for the employer allowed subcontractor employees to work on a 3 tiered tubular welded scaffold without having the inspection of the scaffolding completed and deficiencies corrected.
Recent events (2)
- — I (S) $1989
- — Z (S) $3978
1926.451 G01
- Issued
- Mar 11, 2019
- Penalty
- Initial $3,978 · Current $1,989 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level: a. On or about 10/24/2018, at the jobsite, the supervisor and two subcontractor employees were installing clay bricks and foam board while working from a 3 tiered tubular welded scaffold without fall protection.
Recent events (2)
- — I (S) $1989
- — Z (S) $3978
More inspections at Kygo Masonry, LLC.
View Kygo Masonry, LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343555900.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.