Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: DAVE EVANS CONSTRUCTION, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DAVE EVANS CONSTRUCTION, LLC in 6267 S MAPLE GROVE RD, BOISE, ID 83709 (NAICS 236116). OSHA activity number 343577565.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Dave Evans Construction, LLC — free Get an email when a new federal OSHA severe-injury report for Dave Evans Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
6267 S MAPLE GROVE RD
City
BOISE
State
ID
ZIP
83709
Mailing
7761 W RIVERSIDE DR STE 100, BOISE, ID 83714
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236116
Employees
12
Ownership type
A

7 citations on file for this inspection.

1926.25 A

Other-than-serious 2 instances 8 exposed
Issued
Apr 19, 2019
Abate by
Jun 6, 2019
Penalty
Initial $2,274 · Current $0 Reduced
29 CFR 1926.25(a): During the course of construction, alteration, or repairs,  debris was not kept cleared from work areas, passageways, and stairs, in and around buildings or other structures:    Building Front Common Areas - Building A & Building B:  On November 1, 2018 and at times prior thereto; there were no clear pathways leading to the buildings or exterior work areas, as sheetrock debris covered walking areas and electrical cords crossed walking paths creating a slip/trip hazard.      Note* Abatement certification IS required for this item.
Recent events (2)
  • — I (O) $0
  • — Z (S) $2274

1926.403 A

Serious Gravity 5 3 instances 8 exposed
Issued
Apr 19, 2019
Penalty
Initial $3,031 · Current $1,600 Reduced
29 CFR 1926.403(a): All electrical conductors and equipment were not approved:  a) Dewalt Chop Saw: On November 1, 2018 and at times prior thereto; damaged cords were not repaired to the state in which they were initially approved; strain relief.  b) Skilsaw hand-held radial saw: On November 1, 2018 and at times prior thereto; frayed cord.  Note* Abatement certification IS required for this item.
Recent events (2)
  • — I (S) $1600
  • — Z (S) $3031

1926.405 A02 II I

Serious Gravity 5 3 instances 8 exposed
Issued
Apr 19, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage:  Stairwells and Common Areas Buildings A and B: On November 1, 2018 and at times prior thereto; flexible cords were  found in high traffic areas to include sidewalks, in the areas surrounding the sidewalks, and the stairs and stairways.      Note* Abatement certification IS required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.1052 C01 II

Serious Gravity 5 2 instances 7 exposed
Issued
Apr 19, 2019
Abate by
May 8, 2019
Penalty
Initial $3,030 · Current $1,600 Reduced
29 CFR 1926.1052(c)(1)(ii): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with a stairrail system along each unprotected side or edge:  a) Building A: On November 1, 2018 and at times prior thereto; a stairway to the second floor was missing a stair rail and mid-rail from riser one to riser 7, exposing employees to an unprotected side and edge.           b) Building B: On November 1, 2018 and at times prior thereto; a stairway to the second floor was missing a stair rail and mid-rail from riser one to riser 7, exposing employees to an unprotected side and edge.     Note* Abatement certification IS required for this item.
Recent events (2)
  • — I (S) $1600
  • — Z (S) $3030

1926.1153 C01

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 19, 2019
Abate by
Aug 30, 2019
Penalty
Initial $3,789 · Current $2,000 Reduced
29 CFR 1926.1153(c)(1): For each employee engaged in a task identified on Table 1, the employer did not fully and properly implement the engineering controls, work practices, and respiratory protection specified for the task on Table 1, and did not assess and limit the exposure of the employee to respirable crystalline silica in accordance with paragraph (d) of this section.  a) Outdoors: On or about November 1, 2018 and at times prior thereto; controlling employer did not ensure subcontractor's employees using a hand-held Skilsaw and Dewalt radial saw were using a dust collection control method to reduce silica containing cement fiber board  - HardiePlank airborne particulate exposures.     Note* Abatement certification IS required for this item.
Recent events (2)
  • — I (S) $2000
  • — Z (S) $3789

1926.1153 G01

Serious Gravity 5 1 instance 2 exposed
Issued
Apr 19, 2019
Abate by
Aug 30, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.1153(g)(1): The employer did not establish and implement a written exposure control plan:  a) Outdoors: On or about November 1, 2018 and at times prior thereto; controlling employer's subcontractor was cutting and ripping HardiePlank silica containing siding with the use of a hand-held Skilsaw and Dewalt radial saw without the use of engineering controls.      Note* Abatement certification IS required for this item.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.20 B02

Repeat 4 instances 7 exposed
Issued
Apr 19, 2019
Abate by
Jun 6, 2019
Penalty
Initial $7,578 · Current $1,000 Reduced
29 CFR 1926.20(b)(2): The employer did not initiate and maintain a safety program which provides for frequent and regular inspections of jobsites, materials, and equipment to be made by a competent person:    a) Jobsite: On November 1, 2018 and at times prior thereto; the controlling employer did not ensure that its siding contractor and painting contractor protected their employees from electrical hazards; electrical cords attached to a radial saw, Skilsaw, and powerbox were found frayed and/or inadequately repaired.     b) Jobsite:  On November 1, 2018 and at times prior thereto; subcontractor's equipment did not have engineering controls to reduce exposure to Silica containing dust from cutting Hardie Board siding planks using a radial saw and Skilsaw.     c) Jobsite: On November 1, 2018 and at times prior thereto; housekeeping program did not include maintaining clear walkways or walking paths around equipment and construction debris.       d) Jobsite:  On November 1, 2018 and at times prior thereto; stair rail systems in Buildings A & B had unprotected sides and edges from the first to the seventh riser.     Note* Abatement certification AND documentation is required for this item.    Dave Evans Construction, LLC was previously cited for a violation of this occupational safety and health standard or its equivalent standard, 1926.20(b)(2), which was contained in OSHA inspection number 1151926, citation number 1, item number 1a, and was affirmed as a final order on 8/2/2016, with respect to a workplace located at 6267 S Maple Grove Rd, Boise, ID 83709.
Recent events (2)
  • — I (R) $1000
  • — Z (R) $7578

View Dave Evans Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343577565.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.