WASHINGTON, DC —
OSHA Inspection: SANTOS VASQUEZ
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SANTOS VASQUEZ in 2831 ALABAMA AVE SE, WASHINGTON, DC 20010 (NAICS 238160). OSHA activity number 343591459.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SANTOS VASQUEZ
- Site address
- 2831 ALABAMA AVE SE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20010
- Mailing
- 8012 14TH AVE APT 301, HYATTSVILLE, MD 20783
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 6
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.100 A
- Issued
- Apr 24, 2019
- Abate by
- May 2, 2019
- Penalty
- Initial $3,410 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets: a) On or about October 25, 2018; front roof area; during the installation process employees were exposed to a struck by hazard while working near a man-lift, while receiving roof shingles. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (S) $2000
- — Z (S) $3410
1926.102 A01
- Issued
- Apr 24, 2019
- Abate by
- May 2, 2019
- Penalty
- Initial $3,978 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): The employer did not ensure that each affected employee used appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation. a) On or about October 25, 2018; throughout the site; employees were exposed to a struck by hazard while installing roof shingles and operating pneumatic nail guns without wearing eye protection. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2000
- — Z (S) $3978
1926.451 E01
- Issued
- Apr 24, 2019
- Abate by
- May 2, 2019
- Penalty
- Initial $3,978 · Current $2,000 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. a) On or about October 25, 2018; front of building; employees were using the support ladders of the ladder-jack scaffold system to access the work area exposing them to a fall hazard of approximately 15-feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2000
- — Z (S) $3978
1926.451 G01 I
- Issued
- Apr 24, 2019
- Abate by
- May 2, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(1)(i): Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold was not protected by a personal fall arrest system: a) On or about October 25, 2018; front of commercial building; employees were wearing a climbing harness to protect against falls while working on a ladder-jack scaffold system approximately 17-feet above the concrete side walk. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B11
- Issued
- Apr 24, 2019
- Abate by
- May 2, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.501(b)(11): Each employee on a steep roof with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems with toeboards, safety net systems, or personal fall arrest systems: a) On or about October 25, 2018, roof; employees were observed working on a commercial roof wearing a climbing harness to protect against falls exposing them to a fall hazard of approximately 30-feet. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.503 B01
- Issued
- Apr 24, 2019
- Abate by
- May 2, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(b)(1): The employer did not verify compliance with paragraph (a) of this section by preparing a written (training) certification record including the name or other identity of the employee trained, the date(s) of the training, and the signature of the person who conducted the training or the signature of the employer. a) On or about October 25, 2018; throughout the site; the employer had not certified that fall protection training had been provided to employees that were exposed to fall hazards 6-feet or greater while installing roof shingles. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet).
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Santos Vasquez
View Santos Vasquez's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343591459.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.