Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PROCIDA CONSTRUCTION CORP.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PROCIDA CONSTRUCTION CORP. in 771-775 CROTONA PARK NORTH, BRONX, NY 10460 (NAICS 236220). OSHA activity number 343601217.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Procida Construction Corp. — free Get an email when a new federal OSHA severe-injury report for Procida Construction Corp. is published. One employer, no account, unsubscribe in one click.
Site address
771-775 CROTONA PARK NORTH
City
BRONX
State
NY
ZIP
10460
Mailing
456 EAST 173 ST., BRONX, NY 10457
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
7
Ownership type
A

2 citations on file for this inspection.

1926.201 A

Serious Gravity 1 1 instance 1 exposed
Issued
Nov 30, 2018
Penalty
Initial $3,298 · Current $2,474 Reduced
29 CFR 1926.201(a): Signaling by flaggers and the use of flaggers, including warning garments worn by flaggers did not conform to Part VI of the Manual on Uniform Traffic Control Devices, (1988 Edition, Revision 3 or the Millennium Edition):  location: intersection of Prospect Ave. and Crotona Park North on or about: 11/14/18  a) An employee, flagging for traffic control, was not wearing high visibility garments conforming to Part VI of the Manual on Uniform Traffic Control Devices, (1988 Edition, Revision 3 or the Millennium Edition).   NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Recent events (2)
  • — I (S) $2473.5
  • — Z (S) $3298

1926.752 A01

Other-than-serious 1 instance 9 exposed
Issued
Nov 30, 2018
Penalty
Initial $0 · Current $0
29 CFR 1926.752(a)(1): Before authorizing the commencement of steel erection, the controlling contractor did not ensure that the steel erector was provided with the following written notifications; the concrete in the footings, piers and walls and the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection:  location: entire site on or about: 11/14/18  a) The employer did not provide the steel erector with written notification that the concrete in the footings, piers and walls and the mortar in the masonry piers and walls has attained, on the basis of an appropriate ASTM standard test method of field-cured samples, either 75 percent of the intended minimum compressive design strength or sufficient strength to support the loads imposed during steel erection.  NOTE: Because abatement of this violation is already documented in the inspection casefile, the employer need not submit certification or documentation of abatement for this violation as normally required by 29 CFR 1903.19.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Procida Construction Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343601217.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.