OSHA Inspection: MARON CONSTRUCTION CO., INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MARON CONSTRUCTION CO., INC. in 2841 SOUTH COUNTY TRAIL, EAST GREENWICH, RI 02818 (NAICS 236220). OSHA activity number 343625372.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Maron Construction CO., INC. — free Get an email when a new federal OSHA severe-injury report for Maron Construction CO., INC. is published. One employer, no account, unsubscribe in one click.
Site address
2841 SOUTH COUNTY TRAIL
City
EAST GREENWICH
State
RI
ZIP
02818
Mailing
180 BUTTONHOLE DRIVE, PROVIDENCE, RI 02940
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
40
Ownership type
A

3 citations on file for this inspection.

1926.451 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Jan 9, 2019
Abate by
Jan 18, 2019
Penalty
Initial $4,837 · Current $4,837
29 CFR 1926.451(a)(1): Scaffold and scaffold components were not capable of supporting, without failure, its own weight and at least four times the maximum intended load applied or transmitted to it:   (a) Worksite:  On or about 11/28/2018, the employer did not ensure that the erected scaffold system with wood planks spanning approximately fourteen feet between two scaffold towers, was capable of supporting at least four times the intended load.
Recent events (2)
  • — I (S) $4837
  • — Z (S) $4837

1926.502 B01

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Jan 9, 2019
Abate by
Jan 18, 2019
Penalty
Initial $6,047 · Current $0 Reduced
29 CFR 1926.502(b)(1): The top edge height of the top rails, or equivalent guardrail system members, was not 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level:   (a) Worksite:  On or about 11/28/2018, the employer did not ensure that the top height of wire guardrails were within 3 inches of the required height of 42 inches.
Recent events (2)
  • — I (S) $0
  • — Z (S) $6047

1926.502 B02

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Jan 9, 2019
Abate by
Jan 18, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.502(b)(2): Mid-rails, screens, mesh, intermediate vertical members, or equivalent intermediate structure members were not installed between the top edge of the guardrail system and the walking/working surface when there was no wall or parapet wall at least 21 inches (53 cm) high:  (a) Worksite:  On or about 11/28/2018, employees walked and worked near a wire guardrail system, where the mid-rail was set at approximately 12 inches above the walking/working surface, with the top-rail set at approximately 36 inches above the same surface.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Maron Construction CO., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343625372.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.