Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: WARFEL CONSTRUCTION COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of WARFEL CONSTRUCTION COMPANY in 2001 HARRISBURG PIKE, LANCASTER, PA 17601 (NAICS 236220). OSHA activity number 343633541.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Warfel Construction Company for free Get an email when a new federal OSHA severe-injury report for Warfel Construction Company is published. One employer, no account, unsubscribe in one click.
Site address
2001 HARRISBURG PIKE
City
LANCASTER
State
PA
ZIP
17601
Mailing
1110 ENTERPRISE ROAD, EAST PETERSBURG, PA 17520
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
8
Ownership type
Private (A)

2 citations on file for this inspection.

1926.701 B

Other-than-serious 1 instance 5 exposed
Issued
Jan 30, 2019
Abate by
Feb 26, 2019
Penalty
Initial $8,525 · Current $4,433 Reduced
29 CFR 1926.701(b): All protruding reinforcing steel, onto and into which employees could fall, was not guarded to eliminate the hazard of impalement:    a) 3rd Floor - While accessing and egressing a portable extension ladder through an unfinished elevator shaft, employees were exposed to impalement hazards due to unguarded rebar, on or about November 29, 2018.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (O) $4433
  • · Z (S) $8525

1926.760 A01

Serious Gravity 10 1 instance 5 exposed
Issued
Jan 30, 2019
Abate by
Feb 26, 2019
Penalty
Initial $11,934 · Current $11,934
29 CFR 1926.760(a)(1): Except as provided by paragraph (a)(3) of this section, each employee engaged in a steel erection activity who is on a walking/working surface with an unprotected side or edge more than 15 feet (4.6 m) above a lower level shall be protected from fall hazards by guardrail systems, safety net systems, personal fall arrest systems, positioning device systems or fall restraint systems:  a) 3rd Floor - Employees were observed plumbing up steel columns and were not protected from an approximate 22 foot fall hazard to the ground below, on or about November 29, 2018.  Abatement certification and documentation required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • · I (S) $11934
  • · Z (S) $11934

View Warfel Construction Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 343633541.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.