TEXAS CITY, TX —
OSHA Inspection: EXCEL MODULAR SCAFFOLD AND LEASING CORPORATION
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of EXCEL MODULAR SCAFFOLD AND LEASING CORPORATION in MARATHON PETROLEUM COMPANY GBR 2401 5TH AVENUE SOUTH, TEXAS CITY, TX 77590 (NAICS 238990). OSHA activity number 343672689.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- EXCEL MODULAR SCAFFOLD AND LEASING CORPORATION
- Site address
- MARATHON PETROLEUM COMPANY GBR 2401 5TH AVENUE SOUTH
- City
- TEXAS CITY
- State
- TX
- ZIP
- 77590
- Mailing
- 7001 HIGHWAY 225, DEER PARK, TX 77536
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238990
- Employees
- 450
- Ownership type
- A
Citations
4 citations on file for this inspection.
5(a)(1)
- Issued
- Mar 14, 2019
- Abate by
- Apr 16, 2019
- Penalty
- Initial $13,260 · Current $0 Reduced
General-duty citation text
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to hazards including but not limited to shock from bleeding. a) At Marathon Galveston Bay Refinery, Power 2 South of Pipe Stills & Avenue G: On or about October 30, 2018, an employee sustained a deep laceration resulting in uncontrolled bleeding. The employer failed to properly evaluate the injury and follow medical advice resulting in significant delay in stopping the uncontrolled bleeding and initiation of appropriate medical attention.
Recent events (3)
- — F (S) $0
- — C (S) $13260
- — Z (S) $13260
1904.7 B03
- Issued
- Mar 14, 2019
- Abate by
- Apr 16, 2019
- Penalty
- Initial $1,895 · Current $0 Reduced
General-duty citation text
29 CFR 1904.7(b)(3): The employer did not correctly classify the following work-related injuries or illnesses on the OSHA Form 300 or equivalent. Located at the Marathon Galveston Bay Refinery establishment, the employer did not record the following workplace injury correctly on the OSHA 300 Log for calendar year 2018. a) On or about October 30, 2018 a scaffold builder sustained a laceration requiring surgery and hospitalization; resulting in the inability to perform primary duties. The injury was recorded as other recordable cases even though the injury resulted in days away and restricted work activity.
Recent events (3)
- — F (O) $0
- — C (O) $1895
- — Z (O) $1895
1904.29 B02
- Issued
- Mar 14, 2019
- Abate by
- Apr 16, 2019
- Penalty
- Initial $1,895 · Current $0 Reduced
General-duty citation text
29 CFR 1904.29(b)(2): The employer did not fill out or correctly fill out an OSHA Form 301 or equivalent for each recordable injury or illness. Located at the Marathon Galveston Bay Refinery establishment, the employer did not record the following workplace injury correctly on the OSHA 300 Log for calendar year 2018. a) On or about October 30, 2018 a scaffold builder sustained a deep laceration when an employee attempted to cut a zip tie off his pants with a knife. The injury was recorded as a laceration requiring stiches in block 16 even though the injury required hospitalization and surgical repair by a hand specialist. b) On or about October 30, 2018 a scaffold builder sustained a deep laceration when an employee attempted to cut a zip tie off his pants with a knife. The injury description in block 14 described the injured employee was having another worker cut a piece of tie-wrap on his backside; however, the injured employee was unaware of the foreman's intent or action involving the use of a pocket knife constituting horseplay, which resulted in a serious and debilitating injury.
Recent events (3)
- — F (O) $0
- — C (O) $1895
- — Z (O) $1895
1904.32 B01
- Issued
- Mar 14, 2019
- Abate by
- Apr 16, 2019
- Penalty
- Initial $1,895 · Current $0 Reduced
General-duty citation text
29 CFR 1904.32(b)(1): The employer did not review the OSHA 300 Log entries as extensively as necessary to make sure the entries were complete and correct: Located at the Marathon Galveston Bay Refinery establishment, the employer did not review the 300 log entries as extensively as necessary to ensure they were complete and correct before certifying the OSHA Form 300A or equivalent for the calendar year 2018: a) On or about October 30, 2018 a scaffold builder sustained a laceration requiring surgery and hospitalization; resulting in the inability to perform primary duties. The injury was recorded as other recordable cases even though the injury resulted in days away and restricted work activity.
Recent events (3)
- — F (O) $0
- — C (O) $1895
- — Z (O) $1895
More inspections at Excel Modular Scaffold and Leasing Corporation
View Excel Modular Scaffold and Leasing Corporation's full OSHA safety record →
More inspections in this industry (NAICS 238990)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343672689.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.