OSHA Inspection: RM&K, INC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of RM&K, INC in 2626 SOUTH 37TH STREET, TEMPLE, TX 76504 (NAICS 339999). OSHA activity number 343678348.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch RM&K, INC for free Get an email when a new federal OSHA severe-injury report for RM&K, INC is published. One employer, no account, unsubscribe in one click.
Establishment
RM&K, INC
Site address
2626 SOUTH 37TH STREET
City
TEMPLE
State
TX
ZIP
76504
Mailing
7724 CENTRAL PARK, WACO, TX 76712
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
339999
Employees
5
Ownership type
A

7 citations on file for this inspection.

1910.134 C01

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Mar 11, 2019
Penalty
Initial $1,885 · Current $1,131 Reduced
29 CFR 1910.134(c)(1): In any workplace where respirators are necessary to protect employee health or whenever respirators are required by the employer, a written respiratory protection program that included the provisions in 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented.  On or about December 21, 2018, and at times prior thereto, employees were exposed to respiratory hazards. Employees who were required to wear respirators during tasks including but not limited to grinding carbon fiber material. The employer did not implement or provide a written respiratory protection program including but not limited to the following:  a) Ensuring employees were medically cleared to wear a respirator.  b) Ensuring employees were fit tested to wear selected respirator.  c) Training on proper use and care of respirators.
Recent events (2)
  • · I (S) $1131
  • · Z (S) $1885

1910.215 B09

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Feb 15, 2019
Penalty
Initial $1,885 · Current $1,131 Reduced
29 CFR 1910.215(b)(9): Guard for abrasive wheel machine where the operator stands in front of the machine was not constructed so that the peripheral protecting member could be adjusted to the constantly decreasing diameter of the wheel.  On or about December 21, 2018, and at times prior thereto, employees working in the machine room utilized a Craftsman 3/4 horsepower Bench Grinder to modify prosthetics and orthotics. The grinder was missing the guard on the right side exposing employees to the hazard of being struck by debris in the event of wheel failure.
Recent events (2)
  • · I (S) $1131
  • · Z (S) $1885

1910.242 B

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Feb 15, 2019
Penalty
Initial $1,885 · Current $1,131 Reduced
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.  On or about December 21, 2018, and at times prior thereto, the air nozzle located near the plaster room was operated by employees at 92 p.s.i for cleaning purposes, exposing employees to the hazard of being struck by debris.
Recent events (2)
  • · I (S) $1131
  • · Z (S) $1885

1910.303 G01

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Feb 1, 2019
Penalty
Initial $1,885 · Current $1,131 Reduced
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.  On or about December 21, 2018 and at times prior thereto, electrical panelboards located inside of washroom near the plaster room were blocked by stored supplies and an air compressor, exposing employees to the hazard of electrical shock.
Recent events (2)
  • · I (S) $1131
  • · Z (S) $1885

1910.1200 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Mar 11, 2019
Penalty
Initial $1,885 · Current $1,131 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met. The program shall address and complete the element's described in this section including, but not limited to, the following:  a) Develop a written hazard communication program with a list of hazardous chemicals known to be present in the facility and methods the employer will use to inform employees of the hazards of the chemicals; b) Ensure labeling is maintained for each chemical container, including the identity of the chemical and hazards warnings. For example some containers had no labeling and other containers were hand written as "glue" without the warnings associated with the glue. c) Maintain Safety Data Sheets (SDS) for each hazardous chemical in the workplace; d) Train employees on hazardous chemicals in their workplace on the time of their initial assignment and whenever a new chemical hazard is introduced in the employees' workplace. Employees shall be trained on the requirements of this section, operations in their work area where hazardous chemicals are present, and the location and availability of the written hazard communication program including the list of hazardous chemicals and safety data sheets.  On or about December 21, 2018, and at times prior thereto, the employer had not developed and implemented a written hazard communication program for employees exposed to such chemicals as but not limited to, Barge All Purpose Thinner and Master Quick Drying All- Purpose Cement.
Recent events (2)
  • · I (S) $1131
  • · Z (S) $1885

1910.132 A

Other-than-serious 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Feb 1, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.132(a): Protective equipment was not maintained in a sanitary and reliable condition.  On or about December 21, 2018, and at times prior thereto, protective equipment stored above work benches, such as but not limited to, Peltor Twin Cup Ear Muffs and Safety Glasses were not maintained in a sanitary condition. Employees were using ear muffs covered with debris from plaster and casting operation, exposing employees to health hazards.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

1910.141 A03 I

Other-than-serious 1 instance 2 exposed
Issued
Jan 22, 2019
Abate by
Feb 1, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.141(a)(3)(i): Places of employment were not kept clean to the extent that the nature of the work allowed.  On or about December 21, 2018 and at times prior thereto, plaster, power tools, chemicals, and other debris were observed throughout the Orthotist and Prosthetist work area impeding the work areas and routes to work benches, exposing employees to trip hazards.
Recent events (2)
  • · I (O) $0
  • · Z (O) $0

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343678348.