Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: JLN ASSOCIATES LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of JLN ASSOCIATES LLC in 97 AND 99 CLAY ST, BROOKLYN, NY 11222 (NAICS 238910). OSHA activity number 343692141.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch JLN Associates LLC — free Get an email when a new federal OSHA severe-injury report for JLN Associates LLC is published. One employer, no account, unsubscribe in one click.
Establishment
JLN ASSOCIATES LLC
Site address
97 AND 99 CLAY ST
City
BROOKLYN
State
NY
ZIP
11222
Mailing
199 LEE AVE #894, BROOKLYN, NY 11211
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
Employees
7
Ownership type
A

5 citations on file for this inspection.

1926.25 A

Serious Gravity 5 4 instances 4 exposed
Issued
May 21, 2019
Penalty
Initial $2,273 · Current $2,273
29 CFR 1926.25(a):  During the course of construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, was not kept cleared from work areas, passageways, and stairs, in and around buildings and other structures:    a) There was excessive debris in the work area; employees engaged in gut-renovation construction activities were exposed to trip/slip hazard. Location; cellar.      Location: 97 and 99 Clay St, Brooklyn, NY 11222    On or about 12/7/2018    NOTE:  BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $2273

1926.150 A04

Serious Gravity 1 3 instances 4 exposed
Issued
May 21, 2019
Penalty
Initial $1,705 · Current $1,705
29 CFR 1926.150(a)(4): All fire fighting equipment was not periodically inspected and maintained in operating condition. Defective equipment shall be immediately replaced:    a)  Three fire extinguishers at the construction site were partially discharged; in the event of a fire employees may be exposed to fire hazard and/or delay in escape.     Location: 97 and 99 Clay St, Brooklyn, NY 11222    On or about 12/7/2018    NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1,000.00 AS PER 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $1705

1926.403 I02 I

Serious Gravity 10 3 instances 2 exposed
Issued
May 21, 2019
Penalty
Initial $3,978 · Current $3,978
29 CFR 1926.403(i)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by cabinets or other forms of enclosure:    a) Live wiring was exposed; employees were exposed to electric shock hazard during gut renovation construction activities: --- Live wire was exposed (wire cap was off), loc; cellar, rear apt unit; --- Two electric fuse wiring were without covers, loc; cellar, front apt units.     Location: 97 and 99 Clay St, Brooklyn, NY 11222    On or about 12/7/2018    NOTE:  BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $3978

1926.405 G02 IV

Serious Gravity 5 3 instances 4 exposed
Issued
May 21, 2019
Penalty
Initial $2,273 · Current $2,273
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws;     a)  Walls and ceilings were demolished leaving the premesis wiring (BX wiring) hanging without proper support while energized; employees were exposed to electric shock hazard during gut-renovation construction activities.  --- cables with power outlets were unsupported, pulling against the wire connections;     Location: 97 and 99 Clay St, Brooklyn, NY 11222    On or about 12/7/2018    NOTE:  BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $2273

1926.1052 B01

Serious Gravity 5 1 instance 3 exposed
Issued
May 21, 2019
Penalty
Initial $2,842 · Current $2,842
29 CFR 1926.1052(b)(1): Foot traffic was permitted on metal pan stairways before the tread pans and landing pans were temporarily fitted with wood or other solid material at least to the top edge of each pan:    a) Stairpans were not filled in the new stair going to 2fl in 97 Clay street bldg; construction personnel are exposed to trip/fall hazard when using the stairs.     Location: 97 and 99 Clay St, Brooklyn, NY 11222    On or about 12/7/2018    NOTE:  BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19.
Recent events (1)
  • — Z (S) $2842

View JLN Associates LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343692141.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.