OSHA Inspection: FERDIN CASTELLANOS DBA RHYO SIDING & RESTORATION INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FERDIN CASTELLANOS DBA RHYO SIDING & RESTORATION INC. in 364-372 S. JEWEL CT., PALATINE, IL 60074 (NAICS 238170). OSHA activity number 343694717.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Ferdin Castellanos DBA Rhyo Siding & Restoration INC. for free Get an email when a new federal OSHA severe-injury report for Ferdin Castellanos DBA Rhyo Siding & Restoration INC. is published. One employer, no account, unsubscribe in one click.
Site address
364-372 S. JEWEL CT.
City
PALATINE
State
IL
ZIP
60074
Mailing
1094 HEARTWOOD LN., LAKE ZURICH, IL 60047
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238170
Employees
12
Ownership type
A

11 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Jun 10, 2019
Abate by
Jul 12, 2019
Penalty
Initial $425 · Current $425
29 CFR 1903.19(c)(1): The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:   Ferdin Castellanos dba Rhyo Siding & Restoration Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:   Citation Number            Item Number                    Abatement Date  01                                01                                   02/07/2019  01                                02a                                  02/07/2019  01                                02b                                 02/07/2019  01                                02c                                  02/07/2019  01                                03a                                  02/07/2019  01                                03b                                  02/07/2019  01                                03c                                   02/07/2019  01                                04a                                   03/07/2019  01                                04b                                   03/07/2019  01                                05                                     02/07/2019               In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF THE CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (O) $425

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $3,031 · Current $3,031
29 CFR 1926.100(a):  Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:    a) On January 3, 2019, employees were not wearing protective helmets where there was a possible danger of head injury.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $3031

1926.451 E01

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $4,546 · Current $4,546
29 CFR 1926.451(e)(1): Safe access was not provided to scaffold platforms when the platforms were more than 2 feet above or below the point of access:    a)  On January 3, 2019, employees were not provided with safe access to a pump jack scaffold platform being used at an elevation of approximately 12 feet above the ground.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $4546

1926.1053 B04

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:  a)  On January 3, 2019, employees were using a stepladder without its metal spreaders locked in an open position.   In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $0

1926.1053 B13

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(13): The top or top step of a stepladder was used as a step:  a)  On January 3, 2019, employees were standing above the second step from the top of a stepladder in order to access and egress the roof deck and pump jack scaffold platform.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $0

1926.451 B05 II

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $4,546 · Current $4,546
29 CFR 1926.451(b)(5)(ii): The end of a platform greater than 10 feet in length extended over its support more than 18 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end:     a)  On January 3, 2019, employees were working from a pump jack scaffold platform which was extended approximately seven feet over the end support.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • · Z (S) $4546

1926.451 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level.  a)  On January 3, 2019, employees were exposed to the hazard of falling up to approximately 12 feet to the ground, while performing siding installation work from a pump jack scaffold platform.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • · Z (S) $0

1926.452 J02

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary:   a) On January 3, 2019, pump jack poles used by employees onsite while performing siding installation work were not braced at the bottom to prevent accidental displacement.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • · Z (S) $0

1926.454 A

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 1, 2019
Abate by
Mar 7, 2019
Penalty
Initial $4,546 · Current $4,546
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  a)  On or about January 3, 2019, employer did not provide training to each employee in order to recognize hazards associated with working from pump jack scaffolding and to understand procedures to control or minimize those hazards.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $4546

1926.503 A01

Serious Gravity 5 1 instance 5 exposed
Issued
Feb 1, 2019
Abate by
Mar 7, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.503(a)(1):  The employer did not provide a training program for each employee who might be exposed to fall hazards:    a)  On or about January 3, 2019, employer did not provide training to each employee in order to recognize hazards associated with working at an elevation and to understand procedures to control or minimize those hazards.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $0

1926.501 B13

Serious Gravity 10 1 instance 6 exposed
Issued
Feb 1, 2019
Abate by
Feb 7, 2019
Penalty
Initial $5,304 · Current $5,304
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):    a)  On January 3, 2019, employees engaged in siding installation work were not protected from fall hazards while working at an elevation of up to approximately 19 feet above the ground.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • · Z (S) $5304

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343694717.