Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ALARIC CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ALARIC CORPORATION in NORFOLK NAVAL SHIPYARD BUILDING M-32, PORTSMOUTH, VA 23709 (NAICS 238310). OSHA activity number 343707295.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Alaric Corporation — free Get an email when a new federal OSHA severe-injury report for Alaric Corporation is published. One employer, no account, unsubscribe in one click.
Establishment
ALARIC CORPORATION
Site address
NORFOLK NAVAL SHIPYARD BUILDING M-32
City
PORTSMOUTH
State
VA
ZIP
23709
Mailing
1333 INGLESIDE RD, NORFOLK, VA 23502
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238310
Employees
30
Ownership type
A

1 citation on file for this inspection.

1910.1200 H01

Other-than-serious 1 instance 2 exposed
Issued
Feb 4, 2019
Abate by
Mar 11, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59).  a)    Alaric Corp:    On or about 01/10/2019, employees that used Ready Mix Joint Compound and various other chemicals were not provided with effective information and training, to include pictograms, and safety datasheets on hazardous chemicals in their work area as specified in the Revised 2012 Hazard Communication Standard.  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (O) $0

View Alaric Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343707295.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.