OSHA Inspection: LAMM'S MACHINE, INC

Monitoring inspection · Health discipline

On , OSHA opened a monitoring health inspection of LAMM'S MACHINE, INC in 3216 BERGER ST., ALLENTOWN, PA 18103 (NAICS 332710). OSHA activity number 343712121.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Lamm'S Machine, INC — free Get an email when a new federal OSHA severe-injury report for Lamm'S Machine, INC is published. One employer, no account, unsubscribe in one click.
Establishment
LAMM'S MACHINE, INC
Site address
3216 BERGER ST.
City
ALLENTOWN
State
PA
ZIP
18103
Mailing
3216 BERGER ST., ALLENTOWN, PA 18103
Inspection type
Monitoring (D)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332710
Employees
26
Ownership type
A

7 citations on file for this inspection.

1910.134 D03 I A

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 3, 2019
Abate by
Oct 29, 2019
Penalty
Initial $7,293 · Current $6,721 Reduced

Hazardous substances R290

29 CFR 1910.134(d)(3)(i)(A): The employer did not select a respirator that meets or exceeds the required level of employee protection:    a) Degreasing Room: An employee exposed to 1-bromopropane at 68.89 ppm as an eight hour time weighted average wore a 3M half face respirator with organic vapor cartridges while conducting degreasing operations and the employer did not select a respirator that meets or exceeds the required level of protection as specified in Table 1 of the standard, on or about January 16, 2019.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $6720.5
  • — Z (S) $7293

1910.134 C03

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 3, 2019
Abate by
Oct 29, 2019
Penalty
Initial $0 · Current $0

Hazardous substances R290

29 CFR 1910.134(c)(3): The employer did not designate a program administrator who was qualified by appropriate training or experience to administer or oversee the respiratory protection program and to conduct the required evaluations of program effectiveness:     a) Degreasing Room: The employer did not designate a program administrator who had appropriate training or experience with respiratory protection programs resulting in deficiencies in the program and exposing employees to respiratory hazards, headaches, lightheadedness, nausea, and central nervous system toxicity, on or about January 14, 2019.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 F02

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 3, 2019
Abate by
Oct 29, 2019
Penalty
Initial $0 · Current $0

Hazardous substances R290

29 CFR 1910.134(f)(2): Employee(s) using tight-fitting facepiece respirators were not fit tested whenever a different respirator facepiece (size, style, model or make) was used:    a) Degreasing Room: Employees were required to wear Allegro half face supplied air respirators while cleaning out the degreasing unit and employees were not provided a fit test for this type of respirator, on or about January 14, 2019.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.134 K01 V

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 3, 2019
Abate by
Oct 29, 2019
Penalty
Initial $0 · Current $0

Hazardous substances R290

29 CFR 1910.134(k)(1)(v): The employer did not ensure that each user could demonstrate knowledge of the procedures for respirator maintenance and storage:    a) Degreasing Room: Employees were required to wear 3M half face respirators while conducting degreasing activities and Allegro half face supplied air respirators while cleaning out the degreasing unit. Employees were not provided training on appropriate maintenance and cleaning requirements of the respirators, on or about January 14, 2019.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H03

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 3, 2019
Abate by
Jul 15, 2019
Penalty
Initial $7,293 · Current $6,721 Reduced

Hazardous substances R290

29 CFR 1910.1200(h)(3): The employee training did not include the requirements of 29 CFR 1910.1200(h)(3)(i) through (h)(3)(iv):    a) Degreasing Room: Employees were not provided information about the hazards of Tech Kleen STNPB in the degreasing unit including signs and symptoms of being exposed to 1-bromopropane, on or about January 14, 2019.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $6720.5
  • — Z (S) $7293

1910.134 C01

Repeat Gravity 5 1 instance 3 exposed
Issued
Jul 3, 2019
Abate by
Oct 29, 2019
Penalty
Initial $14,587 · Current $1,000 Reduced

Hazardous substances R290

29 CFR 1910.134(c)(1): A written respiratory protection program that included the provisions in 29 CFR 1910.134(c)(1)(i) - (ix) with worksite specific procedures was not established and implemented for required respirator use:     a) Degreasing Room: Employees were required to wear 3M half face respirators while conducting degreasing activities and Allegro half face supplied air respirators while cleaning out the degreasing unit. The employer did not establish a written respiratory program as required, on or about January 14, 2019.       LAMMS MACHINE, INC, WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD (29 CFR 1910.134(c)(1)) WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 1260141, CITATION NUMBER 1, ITEM NUMBER 2b, AND WAS AFFIRMED AS A FINAL ORDER ON MARCH 15, 2018, WITH RESPECT TO A WORKPLACE LOCATED AT 3216 BERGER ST., ALLENTOWN, PA.
Recent events (2)
  • — I (R) $1000
  • — Z (R) $14587

1910.242 B

Repeat 2 instances 2 exposed
Issued
Jul 3, 2019
Abate by
Jul 16, 2019
Penalty
Initial $291 · Current $291
29 CFR 1910.242(b): Compressed air used for cleaning purposes was not reduced to less than 30 p.s.i.:  a) Abrasive Blasting Room: Compressed air was used to remove abrasive blasting media from recently blasted products and the pressure of the compressed air was greater than 40 psi, on or about January 14, 2019.  b) Assembly Area: Compressed air was used to dry recently tested products and employees and the pressure of the compressed air was greater than 60 psi, on or about January 16, 2019.  LAMMS MACHINE, INC, WAS PREVIOUSLY CITED FOR A VIOLATION OF THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD (29 CFR 1910.242(b)) WHICH WAS CONTAINED IN OSHA INSPECTION NUMBER 1260141, CITATION NUMBER 1, ITEM NUMBER 4, AND WAS AFFIRMED AS A FINAL ORDER ON MARCH 15, 2018, WITH RESPECT TO A WORKPLACE LOCATED AT 3216 BERGER ST., ALLENTOWN, PA.
Recent events (2)
  • — I (R) $291
  • — Z (R) $291

View Lamm'S Machine, INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343712121.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.