FORT BELVOIR, VA —
OSHA Inspection: KELLY FLOORS LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of KELLY FLOORS LLC in BUILDING 247, FORT BELVOIR, VA 22060 (NAICS 238340). OSHA activity number 343721023.
Where did this inspection happen?
- Establishment
- KELLY FLOORS LLC
- Site address
- BUILDING 247
- City
- FORT BELVOIR
- State
- VA
- ZIP
- 22060
- Mailing
- 7118 GEOFFREY WAY SUITE F, FREDERICK, MD 21704
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238340
- Employees
- 15
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.404 B01 II
- Issued
- Abate by
- Penalty
- Initial $2273.00 · Current $1591.00 Reduced
General-duty citation text
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection. a) Building 247, Fort Belvoir, first floor: On or about 01/16/2019, the ground fault circuit interrupter (GFCI) used to supply power to a portable hand drill and wet saw was not used properly to protect a subcontractor employee from a potential electric shock hazard in that the GFCI was not plugged directly into a wall outlet. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1591.1
- — Z (S) $2273
1926.404 F06
- Issued
- Abate by
- Penalty
- Initial $0.00 · Current $0.00
General-duty citation text
29 CFR 1926.404(f)(6): Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous. a) Building 247, Fort Belvoir, first floor: On or about 01/16/2019, the path to ground on the Dewalt wet saw was not permanent and continuous in that the ground prong was missing from the male attachment plug. NOTE: 1926.302(a)(1) Electric power operated tools shall either be of the approved double-insulated type or grounded in accordance with Subpart K of this part. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections in this industry (NAICS 238340)
BAY CITY, MI—2026-07-06
TRI-CITY CUSTOM TILE
LEBANON, PA—2026-07-01
ROME MASONRY AND CONSTRUCTION, LLC
LEBANON, PA—2026-07-01
ROME MASONRY AND CONSTRUCTION, LLC
FRANKFORT, IN—2026-06-16
CUSTOM BUILDING PRODUCTS LLC
VANCOUVER, WA—2026-06-04
WA317991659 - MASTER CRAFT TILE
More inspections in VA
VIRGINIA BEACH, VA—2026-07-16
GRAND SLAM CAR WASH
KILMARNOCK, VA—2026-07-16
CARR'S TIRE SERVICE
COLLINSVILLE, VA—2026-07-16
ACES, LLC
PORTSMOUTH, VA—2026-07-15
DACS INC
MANASSAS, VA—2026-07-15
VAFMC LLC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343721023.