Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: TOBI ENGINEERING, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TOBI ENGINEERING, INC. in 27709 WEST CONCRETE DRIVE, INGLESIDE, IL 60041 (NAICS 332312). OSHA activity number 343744694.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Tobi Engineering, INC. for free Get an email when a new federal OSHA severe-injury report for Tobi Engineering, INC. is published. One employer, no account, unsubscribe in one click.
Site address
27709 WEST CONCRETE DRIVE
City
INGLESIDE
State
IL
ZIP
60041
Mailing
27709 WEST CONCRETE DRIVE, INGLESIDE, IL 60041
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332312
Employees
17
Ownership type
A

9 citations on file for this inspection.

1910.179 J02 III

Deleted Serious Gravity 1 1 instance 3 exposed
Issued
Apr 23, 2019
Abate by
May 10, 2019
Penalty
Initial $2,273 · Current $0 Reduced
29 CFR 1910.179(j)(2)(iii): Monthly inspections of hooks, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier, of the hook inspected, were not performed:  (a) Production - On January 29, 2019, the employer did not conduct a monthly inspection of the hooks for the overhead crane, serial number 165860. The monthly inspection should include a certification record which identifies the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier of the hook being inspected.    In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $2273

1910.179 J02 IV

Deleted Serious Gravity 1 1 instance 3 exposed
Issued
Apr 23, 2019
Abate by
May 10, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.179(j)(2)(iv): Monthly inspections of hoist chains, with a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier of the chain which was inspected, were not performed:  (a) Production - On January 29, 2019, the employer did not ensure that the hoist chains for the overheard crane, serial number 165860 were inspected monthly. The monthly inspection should include a certification record which identifies the date of inspection, the signature of the person who performed the inspection and the serial number, or other identifier of the chain being inspected.  In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.179 L01

Deleted Serious Gravity 1 1 instance 3 exposed
Issued
Apr 23, 2019
Abate by
May 10, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.179(l)(1): A preventive maintenance program based on the crane manufacturer's recommendations was not established:  (a) Production - On January 29, 2019, the employer did not implement the established preventative maintenance program, based on the crane manufacturer's recommendations for the overheard crane, serial number 165860.   In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.179 N04 I

Deleted Serious Gravity 1 1 instance 3 exposed
Issued
Apr 23, 2019
Abate by
May 10, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.179(n)(4)(i): The upper limit switch of each hoist was not tried out under no load, at the beginning of each operator's shift:  (a) Production - On January 29, 2019, the employer did not ensure that the upper hoist limit switches for the overheard crane, serial number 165860, was tried out under no load at the beginning of each operator's shift.      In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.212 A01

Serious Gravity 5 2 instances 2 exposed
Issued
Apr 23, 2019
Abate by
May 3, 2019
Penalty
Initial $3,031 · Current $2,038 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    (a) Production - On January 29, 2019, the employer failed to ensure that adequate methods of guarding were used to protect employees from moving parts such as the rotating chuck and from flying chips on the HWA CHEON lathe.    (b) Welding Room - On January 29, 2019, the employer failed to ensure that adequate methods of guarding were used to protect employees from moving parts such as the unused portion of blade on the metal cutting machine.     In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $2037.5
  • · Z (S) $3031

1910.212 A03 II

Deleted Serious Gravity 10 7 instances 1 exposed
Issued
Apr 23, 2019
Abate by
Jun 10, 2019
Penalty
Initial $5,304 · Current $0 Reduced
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):  (a) Press Department - On January 29, 2019, the employer failed to ensure that point of operations for all seven presses including press #0, #1, #2, #3, #4, #5 and #6, used for compression, were guarded to prevent employees from having any part of their body in the danger zone.    In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $5304

1910.219 D01

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 23, 2019
Abate by
May 3, 2019
Penalty
Initial $3,031 · Current $2,038 Reduced
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):    (a) Welding Room -On January 29, 2019, the employer failed to ensure that pulleys on the metal cutting machine were adequately guarded.       In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $2037.5
  • · Z (S) $3031

1910.219 E01 I

Serious Gravity 5 1 instance 3 exposed
Issued
Apr 23, 2019
Abate by
May 3, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.219(e)(1)(i): Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt:   (a) Welding Room - On January 29, 2019, the employer failed to ensure that horizontal belts on the metal cutting machine were adequately guarded.    In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1910.178 L06

Other-than-serious 1 instance 7 exposed
Issued
Apr 23, 2019
Penalty
Initial $425 · Current $425
29 CFR 1910.178(l)(6): The employer did not certify that each operator has been trained and evaluated as required by this paragraph (l):    (a) Facility wide - On January 29, 2019, the employer did not ensure that the forklift refresher training and evaluation for the seven operators was certified in accordance with paragraph (l).     No abatement certification or documentation is required for this item.
Recent events (2)
  • · I (O) $425
  • · Z (O) $425

View Tobi Engineering, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343744694.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.