OSHA Inspection: HUSTON ELECTRIC, INC.

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of HUSTON ELECTRIC, INC. in GRISSOM AIR RESERVE BASE BULK STORAGE FACILITY, BUNKER HILL, IN 46914 (NAICS 238210). OSHA activity number 343762019.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Huston Electric, INC. — free Get an email when a new federal OSHA severe-injury report for Huston Electric, INC. is published. One employer, no account, unsubscribe in one click.
Site address
GRISSOM AIR RESERVE BASE BULK STORAGE FACILITY
City
BUNKER HILL
State
IN
ZIP
46914
Mailing
PO BOX 4297, LAFAYETTE, IN 47905
Inspection type
Unprogrammed Related (G)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238210
Employees
10
Ownership type
A

3 citations on file for this inspection.

1910.147 C04 II

Other-than-serious 1 instance 1 exposed
Issued
May 17, 2019
Abate by
Aug 13, 2019
Penalty
Initial $9,282 · Current $9,282
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy.    a) On or about January 25, 2019, there were no specific procedures documented in regards to testing and positioning of the Bulk Product Tank (BPRT) bump test.
Recent events (2)
  • — I (O) $9282
  • — Z (S) $9282

1910.147 E02 I

Other-than-serious 1 instance 1 exposed
Issued
May 17, 2019
Abate by
Aug 13, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.147(e)(2)(i): Before lockout or tagout devices were removed and energy was restored to the machine or equipment, authorized employees did not ensure that all employees had been safely positioned or removed from the work area:    a) On or about January 25, 2019, the employer did not ensure employees performing the testing and positioning were safely positioned away from energized equipment such as the BPRT bump test in that the equipment was energized while an employee's hand was located inside the motor compartment.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.147 F01

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
May 17, 2019
Abate by
Jun 20, 2019
Penalty
Initial $9,282 · Current $0 Reduced
29 CFR 1910.147(f)(1):  Testing or positioning of machines, equipment or components thereof. In situations in which lockout or tagout devices must be temporarily removed from the energy isolating device and the machine or equipment energized to test or position the machine, equipment or component thereof, the following sequence of actions shall be followed:  (ii)  Remove employees from the machine or equipment area in accordance with paragraph (e)(2) of this section  a) On or about January 25, 2019, employees were not removed from the Bulk Product Recovery Tank (BPRT) motor bump test prior to removing the lock from the main disconnect inside the bulk fuel storage transfer facility.
Recent events (2)
  • — I (S) $0
  • — Z (S) $9282

View Huston Electric, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343762019.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.