Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,193,745Inspections Most recent open 2026-08-06 Last loaded 2026-08-10

OSHA Inspection: RIGOBERTO RUIZ DBA R R CONSTRUCTION TEAM., INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RIGOBERTO RUIZ DBA R R CONSTRUCTION TEAM., INC. in 8401 N. MILWAUKEE AVE., NILES, IL 60714 (NAICS 238160). OSHA activity number 343807137.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rigoberto Ruiz DBA R R Construction Team., INC. for free Get an email when a new federal OSHA severe-injury report for Rigoberto Ruiz DBA R R Construction Team., INC. is published. One employer, no account, unsubscribe in one click.
Site address
8401 N. MILWAUKEE AVE.
City
NILES
State
IL
ZIP
60714
Mailing
1301 FAIRVIEW AVE., JOLIET, IL 60432
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
6
Ownership type
A

9 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $2,273 · Current $1,315 Reduced
29 CFR 1926.102(a)(1): Employees were not provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents:       a) On February 25, 2019, employees were exposed to eye injury while applying Karnak 108 Quick Dry Asphalt Primer without eye protection during roofing work.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1315
  • · Z (S) $2273

1926.150 C01 VI

Serious Gravity 5 1 instance 6 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $3,410 · Current $1,975 Reduced
29 CFR 1926.150(c)(1)(vi):  A fire extinguisher, rated not less than 10B, was not provided within 50 feet of wherever more than 5 gallons of flammable or combustible liquids or 5 pounds of flammable gas were being used on the jobsite:      a)  On February 25, 2019, a fire extinguisher was not provided where employees were using two propane tanks to fuel roofing torches.      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1975
  • · Z (S) $3410

1926.403 B02

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $2,273 · Current $1,315 Reduced
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification:    a)  On February 25, 2019, employees engaged in roofing work were using a relocatable power tap in an outdoor setting to power tools onsite.         In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1315
  • · Z (S) $2273

1926.404 B01 II

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.404(b)(1)(ii):  Where an assured equipment grounding program was not utilized, receptacles were not protected with ground fault circuit interrupters when on a two-wire, single- phase portable or vehicle-mounted generator rated more than 5kW, or where the circuit conductors of the generator were not insulated from the generator frame and all other grounded surfaces:   a)  On February 25, 2019, employees were using a Powermate, Model No. PMO103007, Portable Generator without a ground fault circuit interrupter to power tools onsite.  In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.404 F06

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.404(f)(6):  The path to ground from circuits, equipment, or enclosures was not permanent and continuous:     a)  On February 25, 2019, extension cords used by employees onsite during roofing work, did not have a permanent and continuous path to ground.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $0
  • · Z (S) $0

1926.501 B10

Serious Gravity 10 1 instance 6 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $3,978 · Current $2,300 Reduced
29 CFR 1926.501(b)(10):  Each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system:      a)  On February 25, 2019, employees were not protected from the hazard of falling while performing roofing work on a low-sloped roof with a height of approximately 18 feet.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • · I (S) $2300
  • · Z (S) $3978

1926.503 A01

Serious Gravity 5 1 instance 6 exposed
Issued
Feb 27, 2019
Abate by
Apr 1, 2019
Penalty
Initial $2,842 · Current $1,700 Reduced
29 CFR 1926.503(a)(1):  The employer did not provide a training program for each employee who might be exposed to fall hazards:      a)  On or about February 25, 2019, employer did not provide training to each employee in order to recognize hazards associated with working at an elevation and to understand procedures to control or minimize those hazards.    In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1700
  • · Z (S) $2842

1926.1053 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 27, 2019
Penalty
Initial $2,842 · Current $1,700 Reduced
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:       a)  On February 25, 2019, an extension ladder used by employees to access and egress the roof did not have its side rails extended at least 3 feet above the roof deck.     No abatement certification or documentation is required for this item.
Recent events (2)
  • · I (S) $1700
  • · Z (S) $2842

1926.1053 B04

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 27, 2019
Abate by
Mar 5, 2019
Penalty
Initial $2,842 · Current $1,695 Reduced
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:          a)  On February 25, 2019, the extension ladder was used by two employees simultaneously to access and/or egress the roof.            In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • · I (S) $1695
  • · Z (S) $2842

View Rigoberto Ruiz DBA R R Construction Team., INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343807137.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.