SPRING, TX —
OSHA Inspection: JOSE CABRERA
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of JOSE CABRERA in 4025 SUNSHINE HOLLOW DR. HARMONY 50 SUBDIVISION, SPRING, TX 77386 (NAICS 238140). OSHA activity number 343815643.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- JOSE CABRERA
- Site address
- 4025 SUNSHINE HOLLOW DR. HARMONY 50 SUBDIVISION
- City
- SPRING
- State
- TX
- ZIP
- 77386
- Mailing
- 523 CORVETTE LN, HOUSTON, TX 77060
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 2
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.1200 E01
- Issued
- Apr 19, 2019
- Abate by
- Jun 1, 2019
- Penalty
- Initial $2,273 · Current $1,200 Reduced
General-duty citation text
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii): On or about February 27, 2019 at the construction site, employees were exposed to hazardous chemicals such as, but not limited to, Spectrum white cement without the employer having developed a hazardous communication program.
Recent events (2)
- — I (S) $1200
- — Z (S) $2273
1910.1200 G01
- Issued
- Apr 19, 2019
- Abate by
- Jun 1, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(1): Employers did not have a safety data sheet in the workplace for each hazardous chemical which they use On or about February 27, 2019 at the construction site, employees were exposed to hazardous chemicals such as, but not limited to, Spectrum white cement without the employer having safety data sheets in the workplace.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.1200 H01
- Issued
- Apr 19, 2019
- Abate by
- Jun 1, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area: (Construction Reference: 1926.59) On or about February 27, 2019 at the construction site, employees were exposed to hazardous chemicals such as, but not limited to, Spectrum white cement without the employer having provided information and training on the chemicals in their work area.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 B01
- Issued
- Apr 19, 2019
- Penalty
- Initial $2,842 · Current $1,600 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) On or about February 27, 2019 on the construction site, employees were exposed to a fall hazard of more than 10 feet while working on a platform that was not fully planked.
Recent events (2)
- — I (S) $1600
- — Z (S) $2842
1926.451 E01
- Issued
- Apr 19, 2019
- Penalty
- Initial $2,842 · Current $1,600 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. On or about February 27, 2019 on the construction site, employees were exposed to a fall hazard while climbing down the scaffold frame, which was more than 2 feet above the ground.
Recent events (2)
- — I (S) $1600
- — Z (S) $2842
1926.451 G01 VII
- Issued
- Apr 19, 2019
- Penalty
- Initial $2,842 · Current $1,600 Reduced
General-duty citation text
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. On or about February 27, 2019 on the construction site, employees were exposed to a fall hazard of more than 10 feet while laying bricks from a scaffold without any type of a fall protection system.
Recent events (2)
- — I (S) $1600
- — Z (S) $2842
More inspections at Jose Cabrera
View Jose Cabrera's full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343815643.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.