OSHA Inspection: TUCKER INDUSTRIAL LIQUID COATINGS INCORPORATED

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of TUCKER INDUSTRIAL LIQUID COATINGS INCORPORATED in 407 NORTH AVE P.O. BOX #1, EAST BERLIN, PA 17316 (NAICS 332812). OSHA activity number 343853826.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Tucker Industrial Liquid Coatings Incorporated — free Get an email when a new federal OSHA severe-injury report for Tucker Industrial Liquid Coatings Incorporated is published. One employer, no account, unsubscribe in one click.
Site address
407 NORTH AVE P.O. BOX #1
City
EAST BERLIN
State
PA
ZIP
17316
Mailing
407 NORTH AVE P.O. BOX #1, EAST BERLIN, PA 17316
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332812
Employees
29
Ownership type
A

4 citations on file for this inspection.

1910.29 B02 I

Serious Gravity 1 1 instance 5 exposed
Issued
Sep 4, 2019
Abate by
Sep 30, 2019
Penalty
Initial $3,381 · Current $2,536 Reduced
29 CFR 1910.29(b)(2)(i):  Midrails were not installed at a height midway between the top edge of the guardrail system and the walking-working surface:    a). Mezzanine Area - There were no midrails installed at the top of the guardrail system of the mezzanine. The opening measured approximately 13.5 inches wide, on or about March 15, 2019.      Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2535.75
  • — Z (S) $3381

1910.29 F04

Serious Gravity 1 1 instance 5 exposed
Issued
Sep 4, 2019
Abate by
Sep 30, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.29(f)(4): Openings in stair rails system exceeded 19 inches (48 cm) at its least dimension;    a). Mezzanine stairway - The opening in the stairwell system measured up to 25 inches, on or about March 15, 2019.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.107 B09

Serious Gravity 1 1 instance 29 exposed
Issued
Sep 4, 2019
Abate by
Oct 14, 2019
Penalty
Initial $3,381 · Current $2,536 Reduced
29 CFR 1910.107(b)(9): A clear space of not less than 3 feet on all sides was not kept free from storage or combustible construction:    a). Plant wide - The spray booths in the facility were not kept free from storage materials on all sides of the booths. The sides of the booths contained, flammable liquid cabinets, work tables, equipment, and other stored material on or about March 15, 2018.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $2535.75
  • — Z (S) $3381

1910.305 B02 I

Other-than-serious 1 instance 29 exposed
Issued
Sep 4, 2019
Abate by
Sep 30, 2019
Penalty
Initial $0 · Current $0
29 CFR 1910.305(b)(2)(i): Each outlet box in completed installations did not have an adequate cover, faceplate, or fixture canopy:    (a) Shop Area - The cover on the electrical outlet box was damaged and did not effectively cover the electrical wires inside the box exposing employees to an electrical hazard, on or about March 15, 2019.      Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Tucker Industrial Liquid Coatings Incorporated's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343853826.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.