Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: STEPHANI MASONRY, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of STEPHANI MASONRY, INC. in 308 BRIARWOOD, LINCOLNSHIRE, IL 60069 (NAICS 238140). OSHA activity number 343859856.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Stephani Masonry, INC. — free Get an email when a new federal OSHA severe-injury report for Stephani Masonry, INC. is published. One employer, no account, unsubscribe in one click.
Site address
308 BRIARWOOD
City
LINCOLNSHIRE
State
IL
ZIP
60069
Mailing
3917 HARPER AVE., GURNEE, IL 60031
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

8 citations on file for this inspection.

1926.102 A01

Serious Gravity 5 4 instances 4 exposed
Issued
May 1, 2019
Abate by
May 7, 2019
Penalty
Initial $2,273 · Current $1,563 Reduced
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:        a) On or about March 19, 2019, employees were exposed to eye and face injury when using a gas powered Stihl Cut Off Saw to cut masonry products without eye and face protection.        In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1562.5
  • — Z (S) $2273

1926.451 B01

Serious Gravity 10 2 instances 4 exposed
Issued
May 1, 2019
Abate by
May 7, 2019
Penalty
Initial $3,978 · Current $2,068 Reduced
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports:           a) On or about March 19, 2019, employees were exposed to the hazard of falling approximately 15 feet while working from scaffolding that was not fully planked.       b) On or about March 19, 2019, employees were exposed to the hazard of falling approximately 20 feet while working from scaffolding that was not fully planked.         In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2068
  • — Z (S) $3978

1926.451 G01

Serious Gravity 10 4 instances 4 exposed
Issued
May 1, 2019
Abate by
May 7, 2019
Penalty
Initial $3,978 · Current $3,978
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:                a) On or about March 19, 2019, employees were exposed to the hazard of falling from elevation of between 15 and 30 feet while working from scaffolding without guardrail systems or other fall protection.           In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $3978
  • — Z (S) $3978

1926.501 B13

Serious Gravity 10 1 instance 1 exposed
Issued
May 1, 2019
Abate by
May 7, 2019
Penalty
Initial $3,978 · Current $0 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):        a) On or about March 19, 2019, employees were not protected from the hazard of falling approximately 21 feet while working from a pitched roof deck.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $3978

1926.451 F07

Serious Gravity 10 1 instance 4 exposed
Issued
May 1, 2019
Abate by
May 28, 2019
Penalty
Initial $3,978 · Current $2,068 Reduced
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration; such activities were not performed only by experienced and trained employees selected for such work by the competent person:       a) On or about March 19, 2019, the employer did not ensure that scaffolding provided for employee use was erected under the supervision and direction of a competent person qualified in scaffolding erection.         In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $2068
  • — Z (S) $3978

1926.454 A

Serious Gravity 10 4 instances 4 exposed
Issued
May 1, 2019
Abate by
May 28, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:     a) On or about March 19, 2019, the employer did not ensure that each employee was provided with training in the recognition and control of the hazards associated with working from scaffolding that was provided for employee use.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.454 B

Serious Gravity 10 4 instances 4 exposed
Issued
May 1, 2019
Abate by
May 28, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:      a) On or about March 19, 2019, the employer did not ensure that each employee involved in the erection, disassembling, and moving of scaffolding was provided with training in the recognition of the hazards.      In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.452 C04

Serious Gravity 5 12 instances 4 exposed
Issued
May 1, 2019
Abate by
May 7, 2019
Penalty
Initial $2,842 · Current $1,324 Reduced
29 CFR 1926.452(c)(4): End frames of tubular welded frame scaffolding were not locked together vertically by use of pins or equivalent means in areas where uplift could occur:    a) On or about March 19, 2019, scaffolding frames were not locked together vertically by the use of pins or equivalent means.      In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1323.5
  • — Z (S) $2842

View Stephani Masonry, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343859856.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.