OSHA Inspection: FLOW LINE VALVE AND CONTROLS, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FLOW LINE VALVE AND CONTROLS, LLC in 110 MAIN PROJECT RD., SCHRIEVER, LA 70395 (NAICS 332911). OSHA activity number 343869152.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Flow Line Valve and Controls, LLC for free Get an email when a new federal OSHA severe-injury report for Flow Line Valve and Controls, LLC is published. One employer, no account, unsubscribe in one click.
Site address
110 MAIN PROJECT RD.
City
SCHRIEVER
State
LA
ZIP
70395
Mailing
110 MAIN PROJECT RD., SCHRIEVER, LA 70395
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332911
Employees
9
Ownership type
A

5 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 5 1 instance 1 exposed
Issued
May 3, 2019
Abate by
Jun 20, 2019
Penalty
Initial $3,789 · Current $2,273 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:   a) On or about March 18, 2019, in the Valve Assembly Room, the employer did not develop written procedures with specific steps for the control of potentially hazardous energy regarding a hydraulic press.
Recent events (2)
  • · I (S) $2273.4
  • · Z (S) $3789

1910.212 A03 II

Serious Gravity 1 1 instance 1 exposed
Issued
May 3, 2019
Abate by
May 15, 2019
Penalty
Initial $2,273 · Current $1,364 Reduced
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):   a) On or about March 18, 2019, in the Valve Assembly Room, the employer failed to ensure a Sears Craftsman drill press (Model No. 113.213213, S/N 9611400021) had a guard around the bit.
Recent events (2)
  • · I (S) $1363.8
  • · Z (S) $2273

1910.253 B04 III

Serious Gravity 5 1 instance 10 exposed
Issued
May 3, 2019
Penalty
Initial $3,789 · Current $2,273 Reduced
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one half-hour:   a) On or about March 18, 2019, at the outside loading dock area, the employer failed to ensure a compressed gas cylinder of oxygen and four compressed gas cylinders of propane were separated by a fire resistant barrier or a distance of at least 20 feet
Recent events (2)
  • · I (S) $2273.4
  • · Z (S) $3789

1910.305 B01 II

Serious Gravity 1 4 instances 1 exposed
Issued
May 3, 2019
Penalty
Initial $2,273 · Current $1,364 Reduced
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed:   a) On or about March 18, 2019, in the air compressor room, the employer failed to ensure all circuit openings in an electrical panel were effectively closed.
Recent events (2)
  • · I (S) $1363.8
  • · Z (S) $2273

1910.305 G02 II

Serious Gravity 1 1 instance 10 exposed
Issued
May 3, 2019
Penalty
Initial $2,273 · Current $1,364 Reduced
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap:   a) On or about March 18, 2019, at the outside loading dock area, an extension cord powering a fan had damage to the outer and inner sheathing. The inner wiring was spliced together and wrapped with tape.
Recent events (2)
  • · I (S) $1363.8
  • · Z (S) $2273

View Flow Line Valve and Controls, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343869152.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.