NEW YORK, NY —
OSHA Inspection: NAMDOR INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of NAMDOR INC. in 25 UNIVERSITY PL, NEW YORK, NY 10003 (NAICS 445110). OSHA activity number 343909214.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- NAMDOR INC.
- Site address
- 25 UNIVERSITY PL
- City
- NEW YORK
- State
- NY
- ZIP
- 10003
- Mailing
- 800 3RD AVE. 5TH FLOOR, NEW YORK, NY 10022
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 445110
- Employees
- 50
- Ownership type
- A
Citations
3 citations on file for this inspection.
1910.303 B01
- Issued
- Sep 16, 2019
- Abate by
- Sep 24, 2019
- Penalty
- Initial $7,577 · Current $4,100 Reduced
General-duty citation text
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) Deli Freezer: On or about April 5, 2019 The pipe heat trace wring in the Deli Freezer was installed by splicing a 2 wire light duty flexible cord and plugging into a receptacle.
Recent events (2)
- — I (S) $4100
- — Z (S) $7577
1910.305 G01 IV A
- Issued
- Sep 16, 2019
- Abate by
- Sep 24, 2019
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Deli Freezer: On or about April 5, 2019 The 2 wire light duty cord powered the pipe heat trace wire was spliced in by using butt splices and not protecting the wire.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.304 G05
- Issued
- Sep 16, 2019
- Abate by
- Sep 24, 2019
- Penalty
- Initial $9,472 · Current $5,400 Reduced
General-duty citation text
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) Deli: On or about April 5, 2019 The electrical conduit and receptacles used to power the slicers in the deli did not have a continuous path to ground.
Recent events (2)
- — I (S) $5400
- — Z (S) $9472
More inspections at Namdor INC.
View Namdor INC.'s full OSHA safety record →
More inspections in this industry (NAICS 445110)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343909214.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.