OSHA Inspection: VLAD RESTORATION LTD

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of VLAD RESTORATION LTD in 311 E. 50TH ST, NEW YORK, NY 10022 (NAICS 238140). OSHA activity number 343915096.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Vlad Restoration LTD — free Get an email when a new federal OSHA severe-injury report for Vlad Restoration LTD is published. One employer, no account, unsubscribe in one click.
Site address
311 E. 50TH ST
City
NEW YORK
State
NY
ZIP
10022
Mailing
84-45 103RD AVE, OZONE PARK, NY 11417
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

5 citations on file for this inspection.

1926.451 D01

Serious Gravity 10 1 instance 2 exposed
Issued
Oct 7, 2019
Abate by
Oct 16, 2019
Penalty
Initial $5,304 · Current $5,304
29 CFR 1926.451(d)(1): All suspension scaffold support devices, such as outrigger beams, cornice hooks, parapet clamps, and similar devices, did not rest on surfaces capable of supporting at least 4 times the load imposed on them by the scaffold operating system  a) Roof parapet wall:  On or about April 8, 2019  Cornice hooks, used to support the suspended scaffold, rested on copping stones that were  not capable of supporting at least 4 times the load imposed on them by a two point suspension scaffold.
Recent events (1)
  • — Z (S) $5304

1926.451 D05 II

Serious Gravity 10 2 instances 2 exposed
Issued
Oct 7, 2019
Abate by
Oct 16, 2019
Penalty
Initial $5,304 · Current $5,304
29 CFR 1926.451(d)(5)(ii): Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps, or similar devices were not supported by bearing blocks.   a) Roof parapet wall:   On or about April 8, 2019  Cornice hooks, used to support a two point suspended scaffold, were not supported by bearing blocks. The building side of the cornice hooks were not in contact with bearing blocks.
Recent events (1)
  • — Z (S) $5304

1926.451 D05 III

Serious Gravity 10 2 instances 2 exposed
Issued
Oct 7, 2019
Abate by
Oct 16, 2019
Penalty
Initial $5,304 · Current $5,304
29 CFR 1926.451(d)(5)(iii): Suspension scaffold support devices such as cornice hooks, roof hooks, roof irons, parapet clamps or similar devices were not secured against movement by tiebacks installed at right angles to the face of the building or structure, or opposing angle tiebacks shall be installed and secured to a structurally sound point of anchorage on the building or structure. Sound points of anchorage include structural members, but do not include standpipes, vents, other piping systems, or electrical conduit.  a) Roof parapet wall:  On or about April 8, 2019  Cornice hooks, used to support a two point suspended scaffold, were not secured by tiebacks that were at right angles or opposing angles to the face of the building to prevent their movement.
Recent events (1)
  • — Z (S) $5304

1926.451 F03

Serious Gravity 10 2 instances 2 exposed
Issued
Oct 7, 2019
Abate by
Oct 16, 2019
Penalty
Initial $5,304 · Current $5,304
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    a) Roof parapet wall:   On or about April 8, 2019   The scaffold was not inspected for visual defects such as lack of bearing blocks under c-hooks and perpendicular tiebacks.
Recent events (1)
  • — Z (S) $5304

1926.451 F07

Serious Gravity 10 2 instances 2 exposed
Issued
Oct 7, 2019
Abate by
Oct 16, 2019
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.   a) Roof parapet wall:    On or about April 8, 2019   The scaffold was not erected by a competent person with the training and experience to erect a swing stage scaffolding in the location.
Recent events (1)
  • — Z (S) $0

View Vlad Restoration LTD's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 343915096.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.